X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474270803000

Well Details

Well ID: 0474270803000
Loading map...
Location: 00/03-08-047-27W4/0
Location Alias: 00/03-08-47-27 W4M
Location Alias 2: 00/03-08-047-27 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 08
County/Municipality: County of Wetaskiwin No. 10
Well Name: BEC BGLEN 3-8-47-27
Operator Name: Bonavista Energy Corporation
License Number: 0007567
License Date: 1954-01-11
License Status: Suspension
Spud Date: 1954-01-16
Final Drill Date: 1954-03-18
Well Total Depth: 2173.80 m
Surface Hole Latitude: 53.034099
Surface Hole Longitude: -113.919220

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-01-11 Obtained License
1954-01-30 Drill Stem Test Performed
1954-02-02 Drill Stem Test Performed
1954-02-03 Drill Stem Test Performed
1954-03-14 Liner Casing Operation Performed
1954-03-18 Finished Drilling
1954-03-18 Perforation Treatment Performed - Open-Hole Completion
1954-03-18 Well Mode changed to Drilled and Cased
1954-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-03-26 Well Began Production
1954-03-26 Well Fluid changed to Crude Oil
1954-03-26 Well Mode changed to Flowing
1979-08-22 Perforation Treatment Performed - Cement Squeeze
1979-08-27 Perforation Treatment Performed - Jet Perforation
1979-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-18 Perforation Treatment Performed - Jet Perforation
1979-09-20 Perforation Treatment Performed - Cement Squeeze
1979-09-21 Perforation Treatment Performed - Cement Squeeze
1979-09-23 Perforation Treatment Performed - Jet Perforation
1979-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-28 Perforation Treatment Performed - Jet Perforation
1979-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-30 Perforation Treatment Performed - Jet Perforation
1979-10-05 Perforation Treatment Performed - Jet Perforation
1979-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-26 Perforation Treatment Performed - Jet Perforation
1984-03-27 Well Log Performed
1984-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-09 Well Fluid changed to Crude Oil
1988-09-09 Well Mode changed to Pumping
1991-06-19 Perforation Treatment Performed - Jet Perforation
1991-06-19 Well Log Performed
1991-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-31 Well Fluid changed to Crude Oil
1995-01-31 Well Mode changed to Suspended
2000-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-20 Plug Back Performed
2000-09-20 Well Fluid changed to Crude Oil
2000-09-20 Well Log Performed
2000-09-20 Well Mode changed to Abandoned Zone
2003-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-16 Plug Back Performed
2003-01-17 Well Log Performed
2003-01-22 Well Log Performed
2003-01-23 Perforation Treatment Performed - Jet Perforation
2003-01-26 Well Log Performed
2003-01-28 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-03-18 Open Hole/Barefoot Completion 2161.00 2173.80 0
1979-09-23 Perforation 2161.50 2163.50 7
1979-09-24 Acid Treatment 2161.50 2163.50 0
1979-09-28 Perforation 2163.50 2164.20 7
1979-09-29 Acid Treatment 2161.50 2164.20 0
1979-09-30 Perforation 2164.50 2164.80 7
1979-10-05 Perforation 2168.50 2170.00 7
1979-10-06 Acid Treatment 2161.50 2170.00 0
1984-03-26 Perforation 2167.20 2168.40 14
1984-03-28 Acid Treatment 2167.20 2168.40 0
1991-06-19 Perforation 2166.30 2171.30 20
1954-03-19 Acid Treatment 2161.00 2173.80 0
1991-06-20 Acid Treatment 2161.50 2171.30 0
1993-08-10 Acid Treatment 2161.50 2171.30 0
2000-09-20 Packing Device Capped w/Cement 2144.00 2152.00 0
2003-01-16 Packing Device Capped w/Cement 1900.00 2146.00 0
2003-01-23 Perforation 1636.80 1638.30 13
2003-01-28 Perforation 1622.50 1625.00 13
1954-03-23 Acid Treatment 2161.00 2173.80 0
1979-08-22 Cement Squeeze 2161.00 2173.80 0
1979-08-27 Perforation 2163.50 2165.80 7
1979-08-28 Acid Treatment 2163.50 2165.80 0
1979-09-18 Perforation 2165.20 2168.90 3
1979-09-20 Cement Squeeze 2163.50 2168.90 0
1979-09-21 Cement Squeeze 2163.50 2168.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1979 240 0.0 0.0 0.0
1980 6282 0.0 0.0 0.0
1982 696 0.0 0.0 0.0
1983 5839 0.0 0.0 0.0
1984 7653 0.0 0.0 0.0
1985 7567 0.0 0.0 0.0
1986 7811 0.0 0.0 0.0
1987 6992 0.0 0.0 0.0
1988 7844 0.0 0.0 0.0
1989 6829 0.0 0.0 0.0
1990 7633 0.0 0.0 0.0
1991 6579 0.0 0.0 0.0
1992 8171 0.0 0.0 0.0
1993 8139 0.0 0.0 0.0
1994 8042 0.0 0.0 0.0
1995 360 0.0 0.0 0.0

For data sources see[5]

References