X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474270712002

Well Details

Well ID: 0474270712002
Loading map...
Location: 00/12-07-047-27W4/2
Location Alias: 00/12-07-47-27 W4M
Location Alias 2: 00/12-07-047-27 W4/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 07
County/Municipality: County of Wetaskiwin No. 10
Well Name: DUE WEST BONNIE GLEN 12-7-47-27
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0006751
License Date: 1953-07-17
License Status: Abandoned
Spud Date: 1953-07-19
Final Drill Date: 1979-12-19
Well Total Depth: 2224.30 m
Surface Hole Latitude: 53.040703
Surface Hole Longitude: -113.946950

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-17 Obtained License
1953-08-26 Production Casing Operation Performed
1979-12-19 Finished Drilling
1979-12-19 Perforation Treatment Performed - Open-Hole Completion
1979-12-19 Well Mode changed to Drilled and Cased
1980-03-20 Perforation Treatment Performed - Jet Perforation
1980-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-27 Well Began Production
1980-03-27 Well Fluid changed to Crude Oil
1980-03-27 Well Mode changed to Flowing
1981-02-11 Perforation Treatment Performed - Jet Perforation
1981-07-03 Perforation Treatment Performed - Cement Squeeze
1981-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-25 Well Fluid changed to Crude Oil
1981-08-25 Well Mode changed to Pumping
1983-09-09 Perforation Treatment Performed - Cement Squeeze
1983-09-12 Perforation Treatment Performed - Cement Squeeze
1983-09-15 Perforation Treatment Performed - Jet Perforation
1985-05-01 Liner Casing Operation Performed
1985-05-01 Perforation Treatment Performed - Cement Squeeze
1985-05-06 Well Log Performed
1985-05-08 Perforation Treatment Performed - Jet Perforation
1985-05-08 Well Log Performed
1985-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-16 Well Began Injection
1985-05-16 Well Fluid changed to Water
1985-05-16 Well Type changed to Disposal
1993-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-12-10 Plug Back Performed
1993-12-10 Well Fluid changed to Water
1993-12-10 Well Mode changed to Abandoned
1993-12-10 Well Type changed to Disposal
1993-12-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-19 Open Hole/Barefoot Completion 2196.10 2197.60 0
1985-05-01 Cement Squeeze 2193.70 2194.70 0
1985-05-08 Perforation 2213.00 2214.00 13
1985-05-08 Perforation 2218.80 2219.80 13
1985-05-09 Acid Treatment 2213.00 2219.80 0
1993-12-10 Packing Device Capped w/Cement 2197.00 2205.00 0
1980-03-20 Perforation 2186.50 2190.20 13
1980-03-27 Acid Treatment 2186.50 2197.60 0
1981-02-11 Perforation 2193.50 2195.20 13
1981-07-03 Cement Squeeze 2196.10 2197.60 0
1981-07-04 Acid Treatment 2186.50 2190.20 0
1983-09-09 Cement Squeeze 2186.50 2190.20 0
1983-09-12 Cement Squeeze 2193.50 2195.20 0
1983-09-15 Perforation 2193.70 2194.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 684 0.0 0.0 0.0
1981 432 0.0 0.0 0.0
1983 205 0.0 0.0 0.0
1984 96 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

References