If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0474270514002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.031303,"lon":-113.919253,"icon":""}]} |
Location: 00/14-05-047-27W4/2 | |
Location Alias: 00/14-05-47-27 W4M | |
Location Alias 2: 00/14-05-047-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 4 | |
Range: 27 | |
Section: 05 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: CHEVRON BGLEN 14-5-47-27 | |
Operator Name: Chevron Canada Limited | |
License Number: 0008009 | |
License Date: 1954-05-10 | |
License Status: RecCertified | |
Spud Date: 1954-06-04 | |
Final Drill Date: 1954-07-29 | |
Well Total Depth: 2192.50 m | |
Surface Hole Latitude: 53.031303 | |
Surface Hole Longitude: -113.919253 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-05-10 | Obtained License |
1954-06-04 | Direction Drilling Operation Performed - 98 |
1954-06-24 | Drill Stem Test Performed |
1954-07-25 | Production Casing Operation Performed |
1954-07-29 | Finished Drilling |
1954-07-29 | Perforation Treatment Performed - Open-Hole Completion |
1954-07-29 | Well Mode changed to Drilled and Cased |
1954-07-31 | Well Began Production |
1954-07-31 | Well Fluid changed to Crude Oil |
1954-07-31 | Well Mode changed to Flowing |
1972-12-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-09-10 | Perforation Treatment Performed - Cement Plug |
1979-09-10 | Perforation Treatment Performed - Open-Hole Completion |
1981-08-13 | Well Fluid changed to Crude Oil |
1981-08-13 | Well Mode changed to Pumping |
1985-10-30 | Perforation Treatment Performed - Open-Hole Completion |
1985-11-02 | Well Log Performed |
1985-11-04 | Liner Casing Operation Performed |
1985-11-04 | Perforation Treatment Performed - Cement Squeeze |
1985-11-14 | Perforation Treatment Performed - Jet Perforation |
1985-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-04-04 | Perforation Treatment Performed - Jet Perforation |
1996-04-04 | Well Log Performed |
1996-04-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-12-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-12-06 | Plug Back Performed |
1998-12-06 | Well Log Performed |
1998-12-07 | Well Log Performed |
1998-12-08 | Perforation Treatment Performed - Jet Perforation |
1998-12-09 | Perforation Treatment Performed - Cement Squeeze |
1998-12-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-12-10 | Perforation Treatment Performed - Jet Perforation |
1998-12-10 | Plug Back Performed |
1998-12-10 | Well Log Performed |
1998-12-11 | Perforation Treatment Performed - Remedial Casing |
1999-01-19 | Well Abandoned |
1999-01-19 | Well Fluid changed to Crude Oil |
1999-01-19 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1954-06-04 | 2055.60 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1954-07-29 | Open Hole/Barefoot Completion | 2175.40 | 2182.40 | 0 |
1996-04-10 | Acid Treatment | 2177.00 | 2177.50 | 0 |
1998-12-06 | Packing Device Capped w/Cement | 2162.00 | 2170.00 | 0 |
1998-12-08 | Perforation | 1005.00 | 1006.00 | 14 |
1998-12-09 | Cement Squeeze | 1005.00 | 1006.00 | 0 |
1998-12-10 | Packing Device Capped w/Cement | 985.00 | 993.00 | 0 |
1998-12-10 | Perforation | 245.00 | 246.00 | 14 |
1998-12-11 | Remedial Casing Cementing | 245.00 | 246.00 | 0 |
1972-12-21 | Acid Treatment | 2175.40 | 2182.40 | 0 |
1979-09-10 | Cement Plug | 2178.70 | 2182.40 | 0 |
1979-09-10 | Open Hole/Barefoot Completion | 2175.40 | 2178.70 | 0 |
1985-10-30 | Open Hole/Barefoot Completion | 2175.40 | 2192.50 | 0 |
1985-11-04 | Cement Squeeze | 2175.40 | 2192.50 | 0 |
1985-11-14 | Perforation | 2179.50 | 2180.00 | 13 |
1985-11-15 | Acid Treatment | 2179.50 | 2180.00 | 0 |
1996-04-04 | Perforation | 2177.00 | 2177.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 774 | 0.0 | 0.0 | 0.0 |
1973 | 4866 | 0.0 | 0.0 | 0.0 |
1974 | 3471 | 0.0 | 0.0 | 0.0 |
1975 | 2468 | 0.0 | 0.0 | 0.0 |
1976 | 2132 | 0.0 | 0.0 | 0.0 |
1977 | 2860 | 0.0 | 0.0 | 0.0 |
1978 | 1906 | 0.0 | 0.0 | 0.0 |
1979 | 6074 | 0.0 | 0.0 | 0.0 |
1980 | 1594 | 0.0 | 0.0 | 0.0 |
1981 | 4867 | 0.0 | 0.0 | 0.0 |
1982 | 5907 | 0.0 | 0.0 | 0.0 |
1983 | 7824 | 0.0 | 0.0 | 0.0 |
1984 | 6148 | 0.0 | 0.0 | 0.0 |
1985 | 1258 | 0.0 | 0.0 | 0.0 |
1986 | 6160 | 0.0 | 0.0 | 0.0 |
1987 | 8571 | 0.0 | 0.0 | 0.0 |
1988 | 8173 | 0.0 | 0.0 | 0.0 |
1989 | 7146 | 0.0 | 0.0 | 0.0 |
1990 | 6453 | 0.0 | 0.0 | 0.0 |
1991 | 6680 | 0.0 | 0.0 | 0.0 |
1992 | 6682 | 0.0 | 0.0 | 0.0 |
1993 | 1104 | 0.0 | 0.0 | 0.0 |
1994 | 6816 | 0.0 | 0.0 | 0.0 |
1995 | 8611 | 0.0 | 0.0 | 0.0 |
1996 | 7123 | 0.0 | 0.0 | 0.0 |
For data sources see[6]