X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474201002000

Well Details

Well ID: 0474201002000
Loading map...
Location: 00/02-10-047-20W4/0
Location Alias: 00/02-10-47-20 W4M
Location Alias 2: 00/02-10-047-20 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 20
Section: 10
County/Municipality: Camrose
Well Name: BASHAW NORTH CAMROSE NO. 2-10
Operator Name: Canadian Turbo Inc.
License Number: 0007039
License Date: 1953-09-10
License Status: RecCertified
Spud Date: 1953-09-11
Final Drill Date: 1953-09-18
Well Total Depth: 999.70 m
Surface Hole Latitude: 53.034336
Surface Hole Longitude: -112.839879

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-09-10 Obtained License
1953-09-17 Drill Stem Test Performed
1953-09-18 Drill Stem Test Performed
1953-09-18 Finished Drilling
1953-09-18 Well Mode changed to Drilled and Cased
1953-09-19 Production Casing Operation Performed
1953-09-22 Perforation Treatment Performed - Bullet Perforation
1953-09-23 Perforation Treatment Performed - Bullet Perforation
1953-10-10 Well Began Production
1953-10-10 Well Fluid changed to Crude Oil
1953-10-10 Well Mode changed to Flowing
1955-07-15 Perforation Treatment Performed - Jet Perforation
1955-07-16 Well Fluid changed to Crude Oil
1955-07-16 Well Mode changed to Pumping
1962-08-13 Well Fluid changed to Crude Oil
1962-08-13 Well Mode changed to Suspended
1963-06-21 Well Fluid changed to Crude Oil
1963-06-21 Well Mode changed to Pumping
1970-11-21 Well Fluid changed to Crude Oil
1970-11-21 Well Mode changed to Suspended
1978-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-10-20 Well Abandoned
1978-10-20 Well Fluid changed to Crude Oil
1978-10-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-09-22 Bullet Perforation 979.90 980.20 7
1953-09-23 Bullet Perforation 983.00 983.30 13
1953-09-23 Bullet Perforation 983.30 983.60 13
1953-09-23 Bullet Perforation 983.00 983.90 13
1953-09-23 Bullet Perforation 982.10 983.00 13
1955-07-15 Perforation 979.90 982.70 13
1978-10-20 Packing Device Capped w/Cement 964.70 964.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 744 0.0 0.0 0.0
1968 2183 0.0 0.0 0.0
1969 5424 0.0 0.0 0.0
1970 4973 0.0 0.0 0.0

For data sources see[5]

References