X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474133107002

Well Details

Well ID: 0474133107002
Loading map...
Location: 00/07-31-047-13W4/2
Location Alias: 00/07-31-47-13 W4M
Location Alias 2: 00/07-31-047-13 W4/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 13
Section: 31
County/Municipality: Beaver County
Well Name: PINE CLIFF BRUCE 7-31-47-13
Operator Name: Pine Cliff Energy Ltd.
License Number: 0064984
License Date: 1977-07-27
License Status: Abandoned
Spud Date: 1977-07-28
Final Drill Date: 1977-07-30
Well Total Depth: 856.50 m
Surface Hole Latitude: 53.092863
Surface Hole Longitude: -111.888710

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-07-27 Obtained License
1977-07-30 Drill Stem Test Performed
1977-07-30 Finished Drilling
1977-07-30 Well Mode changed to Drilled and Cased
1977-07-31 Drill Stem Test Performed
1977-08-01 Production Casing Operation Performed
1977-08-30 Perforation Treatment Performed - Jet Perforation
1977-08-31 Perforation Treatment Performed - Cement Squeeze
1977-09-02 Perforation Treatment Performed - Cement Squeeze
1977-09-02 Perforation Treatment Performed - Jet Perforation
1977-09-06 Perforation Treatment Performed - Cement Squeeze
1977-09-07 Perforation Treatment Performed - Cement Squeeze
1977-09-11 Perforation Treatment Performed - Jet Perforation
1977-09-12 Perforation Treatment Performed - Jet Perforation
1977-10-14 Well Began Production
1977-10-14 Well Fluid changed to Gas
1977-10-14 Well Mode changed to Flowing
1978-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-11 Perforation Treatment Performed - Cement Squeeze
1978-08-16 Perforation Treatment Performed - Cement Squeeze
1978-08-24 Perforation Treatment Performed - Jet Perforation
1978-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-25 Perforation Treatment Performed - Cement Squeeze
1978-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-28 Perforation Treatment Performed - Jet Perforation
1978-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-01 Perforation Treatment Performed - Cement Squeeze
1978-09-03 Perforation Treatment Performed - Jet Perforation
1978-12-28 Well Fluid changed to Gas
1978-12-28 Well Mode changed to Suspended
1983-06-01 Well Fluid changed to Gas
1983-06-01 Well Mode changed to Flowing
1983-07-01 Well Fluid changed to Gas
1983-07-01 Well Mode changed to Suspended
1985-02-01 Well Fluid changed to Gas
1985-02-01 Well Mode changed to Flowing
1986-11-02 Well Fluid changed to Gas
1986-11-02 Well Mode changed to Suspended
1991-05-17 Well Fluid changed to Gas
1991-05-17 Well Mode changed to Flowing
1993-06-01 Well Fluid changed to Gas
1993-06-01 Well Mode changed to Suspended
2002-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-20 Plug Back Performed
2002-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-21 Perforation Treatment Performed - Jet Perforation
2002-09-21 Perforation Treatment Performed - Remedial Casing
2002-09-21 Plug Back Performed
2002-09-21 Well Fluid changed to Gas
2002-09-21 Well Log Performed
2002-09-21 Well Mode changed to Abandoned Zone
2002-10-03 Well Abandoned
2002-10-03 Well Fluid changed to Gas
2002-10-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-08-30 Perforation 801.00 804.10 7
1978-08-11 Cement Squeeze 817.20 820.80 0
1978-08-16 Cement Squeeze 817.20 820.80 0
1978-08-24 Perforation 827.20 828.40 13
1978-08-25 Acid Treatment 827.20 828.40 0
1978-08-25 Cement Squeeze 827.20 828.40 0
1978-08-26 Acid Treatment 434.30 434.90 0
1978-08-28 Perforation 817.20 821.10 7
1978-08-30 Acid Treatment 817.20 821.10 0
1978-09-01 Acid Treatment 817.20 821.10 0
1978-09-01 Cement Squeeze 817.20 821.10 0
1977-08-31 Cement Squeeze 801.00 804.10 0
1978-09-03 Perforation 817.20 819.90 7
2002-09-20 Packing Device Capped w/Cement 805.00 813.00 0
2002-09-21 Packing Device Capped w/Cement 744.00 752.00 0
2002-09-21 Perforation 170.00 170.30 13
2002-09-21 Remedial Casing Cementing 170.00 170.30 0
1977-09-02 Perforation 434.30 434.90 13
1977-09-02 Cement Squeeze 434.30 434.90 0
1977-09-06 Cement Squeeze 434.30 434.90 0
1977-09-07 Cement Squeeze 434.30 434.90 0
1977-09-11 Perforation 757.10 759.90 7
1977-09-12 Perforation 817.20 820.80 7
1978-08-11 Acid Treatment 817.20 820.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 1579 0.0 0.0 0.0
1978 3029 0.0 0.0 0.0
1979 288 0.0 0.0 0.0
1983 49 0.0 0.0 0.0
1985 893 0.0 0.0 0.0
1986 1 0.0 0.0 0.0
1991 2052 0.0 0.0 0.0

For data sources see[5]

References