If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0474132311004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.067993,"lon":-111.801083,"icon":""}]} |
Location: 00/11-23-047-13W4/4 | |
Location Alias: 00/11-23-47-13 W4M | |
Location Alias 2: 00/11-23-047-13 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 4 | |
Range: 13 | |
Section: 23 | |
County/Municipality: Beaver County | |
Well Name: WLEC VIK-KINS 11-23-47-13 | |
Operator Name: West Lake Energy Corp. | |
License Number: 0120549 | |
License Date: 1985-12-19 | |
License Status: Abandoned | |
Spud Date: 1986-01-07 | |
Final Drill Date: 1986-01-09 | |
Well Total Depth: 852.00 m | |
Surface Hole Latitude: 53.067993 | |
Surface Hole Longitude: -111.801083 |
Date | Event |
---|---|
1985-12-19 | Obtained License |
1986-01-07 | Surface Casing Operation Performed |
1986-01-08 | Drill Stem Test Performed |
1986-01-09 | Finished Drilling |
1986-01-09 | Well Log Performed |
1986-01-09 | Well Mode changed to Drilled and Cased |
1986-01-10 | Well Log Performed |
1986-01-11 | Drill Stem Test Performed |
1986-01-11 | Production Casing Operation Performed |
1986-01-11 | Rig Released |
1986-02-06 | Well Log Performed |
1986-02-08 | Perforation Treatment Performed - Jet Perforation |
1986-02-12 | Perforation Treatment Performed - Jet Perforation |
1996-02-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-02-26 | Plug Back Performed |
1996-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-02-27 | Perforation Treatment Performed - Jet Perforation |
1996-02-27 | Plug Back Performed |
1996-02-27 | Well Log Performed |
2002-07-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-07-29 | Plug Back Performed |
2002-07-29 | Well Log Performed |
2002-08-04 | Perforation Treatment Performed - Jet Perforation |
2002-08-04 | Well Log Performed |
2002-08-07 | Perforation Treatment Performed - Fractured |
2002-12-05 | Well Began Production |
2002-12-05 | Well Fluid changed to Gas |
2002-12-05 | Well Mode changed to Flowing |
2017-09-01 | Well Fluid changed to Gas |
2017-09-01 | Well Mode changed to Suspended |
2018-08-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-08-20 | Plug Back Performed |
2018-08-20 | Well Fluid changed to Gas |
2018-08-20 | Well Log Performed |
2018-08-20 | Well Mode changed to Abandoned Zone |
2019-05-14 | Well Abandoned |
2019-05-14 | Well Fluid changed to Gas |
2019-05-14 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-02-08 | Perforation | 808.50 | 809.50 | 14 |
2002-08-07 | Fracture | 686.00 | 697.00 | 0 |
2018-08-20 | Packing Device Capped w/Cement | 667.00 | 675.00 | 0 |
2018-08-20 | Packing Device Capped w/Cement | 667 | 675 | 0 |
1986-02-08 | Perforation | 795.50 | 809.00 | 14 |
1986-02-12 | Perforation | 824.50 | 825.50 | 14 |
1996-02-26 | Packing Device Capped w/Cement | 820.70 | 820.70 | 0 |
1996-02-27 | Packing Device Capped w/Cement | 790.00 | 790.00 | 0 |
1996-02-27 | Perforation | 771.00 | 772.00 | 13 |
2002-07-29 | Packing Device Capped w/Cement | 757.00 | 765.50 | 0 |
2002-08-04 | Perforation | 686.00 | 689.00 | 17 |
2002-08-04 | Perforation | 694.00 | 697.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 594 | 0.0 | 0.0 | 0.0 |
2003 | 8539 | 0.0 | 0.0 | 0.0 |
2004 | 8709 | 0.0 | 0.0 | 0.0 |
2005 | 8713 | 0.0 | 0.0 | 0.0 |
2006 | 8627 | 0.0 | 0.0 | 0.0 |
2007 | 8720 | 0.0 | 0.0 | 0.0 |
2008 | 8697 | 0.0 | 0.0 | 0.0 |
2009 | 8677 | 0.0 | 0.0 | 0.0 |
2010 | 8654 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 4127 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-08-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]