X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474101315020

Well Details

Well ID: 0474101315020
Loading map...
Location: 02/15-13-047-10W4/0
Location Alias: 02/15-13-47-10 W4M
Location Alias 2: 02/15-13-047-10 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 10
Section: 13
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CVE 15D VIK-KINS 15-13-47-10
Operator Name: Cardinal Energy Ltd.
License Number: 0224721
License Date: 1999-07-22
License Status: Issued
Spud Date: 1999-07-31
Final Drill Date: 1999-08-02
Well Total Depth: 880.00 m
Surface Hole Latitude: 53.056087
Surface Hole Longitude: -111.328462

For data sources see[1][2]

Well History

Date Event
1999-07-22 Obtained License
1999-07-31 Direction Drilling Operation Performed - Deviate
1999-07-31 Surface Casing Operation Performed
1999-08-02 Finished Drilling
1999-08-02 Well Log Performed
1999-08-03 Production Casing Operation Performed
1999-08-03 Rig Released
1999-08-03 Well Mode changed to Drilled and Cased
1999-08-17 Well Log Performed
1999-09-26 Perforation Treatment Performed - Open-Hole Completion
1999-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-27 Perforation Treatment Performed - Jet Perforation
1999-09-27 Plug Back Performed
1999-09-27 Well Log Performed
1999-10-03 Perforation Treatment Performed - Jet Perforation
1999-10-03 Well Log Performed
1999-10-06 Perforation Treatment Performed - Fractured
1999-11-29 Well Began Production
1999-11-29 Well Fluid changed to Crude Oil
1999-11-29 Well Mode changed to Pumping
1999-12-04 Well Log Performed
1999-12-07 Well Log Performed
2000-04-29 Perforation Treatment Performed - Jet Perforation
2000-04-29 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-07-31 164.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-09-26 Open Hole/Barefoot Completion 877.70 880.00 0
1999-09-27 Perforation 871.00 875.00 20
1999-09-27 Packing Device Capped w/Cement 857.00 865.00 0
1999-10-03 Perforation 821.50 823.50 17
1999-10-06 Fracture 821.50 823.50 0
2000-04-29 Perforation 821.00 825.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 792 0.0 0.0 0.0
2000 7291 0.0 0.0 0.0
2001 8727 0.0 0.0 0.0
2002 8539 0.0 0.0 0.0
2003 8607 0.0 0.0 0.0
2004 8749 0.0 0.0 0.0
2005 8680 0.0 0.0 0.0
2006 8751 0.0 0.0 0.0
2007 8698 0.0 0.0 0.0
2008 8477 0.0 0.0 0.0
2009 8519 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8687 0.0 0.0 0.0
2014 8718 0.0 0.0 0.0
2015 8682 0.0 0.0 0.0
2016 8512 0.0 0.0 0.0
2017 8605 0.0 0.0 0.0
2018 8692 0.0 0.0 0.0
2019 8419 0.0 0.0 0.0
2020 1826 0.0 0.0 0.0

For data sources see[6]

References