X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474092810040

Well Details

Well ID: 0474092810040
Loading map...
Location: 04/10-28-047-09W4/0
Location Alias: 04/10-28-47-09 W4M
Location Alias 2: 04/10-28-047-09 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 09
Section: 28
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CVE 10C VIK-KINS 10-28-47-9
Operator Name: Cardinal Energy Ltd.
License Number: 0218648
License Date: 1998-11-13
License Status: Issued
Spud Date: 1998-12-15
Final Drill Date: 1998-12-17
Well Total Depth: 884.00 m
Surface Hole Latitude: 53.080857
Surface Hole Longitude: -111.258900

For data sources see[1][2]

Well History

Date Event
1998-11-13 Obtained License
1998-12-15 Direction Drilling Operation Performed - Deviate
1998-12-15 Surface Casing Operation Performed
1998-12-17 Finished Drilling
1998-12-17 Production Casing Operation Performed
1998-12-17 Rig Released
1998-12-17 Well Log Performed
1998-12-17 Well Mode changed to Drilled and Cased
1999-01-06 Well Log Performed
1999-03-16 Perforation Treatment Performed - Jet Perforation
1999-03-17 Well Log Performed
1999-03-27 Perforation Treatment Performed - Fractured
1999-09-06 Well Began Production
1999-09-06 Well Fluid changed to Crude Oil
1999-09-06 Well Mode changed to Pumping
2000-11-30 Well Fluid changed to Crude Oil
2000-11-30 Well Mode changed to Suspended
2001-09-01 Well Fluid changed to Crude Oil
2001-09-01 Well Mode changed to Pumping
2001-10-31 Well Fluid changed to Crude Oil
2001-10-31 Well Mode changed to Suspended
2007-02-06 Well Fluid changed to Crude Oil
2007-02-06 Well Mode changed to Pumping
2010-04-27 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-12-15 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-16 Perforation 830.50 832.50 14
1999-03-27 Fracture 830.50 832.50 0
2010-04-27 Chemical Squeeze 830.50 832.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 2810 0.0 0.0 0.0
2000 6305 0.0 0.0 0.0
2001 432 0.0 0.0 0.0
2007 7852 0.0 0.0 0.0
2008 8683 0.0 0.0 0.0
2009 8746 0.0 0.0 0.0
2010 4790 0.0 0.0 0.0
2012 7176 0.0 0.0 0.0
2013 8639 0.0 0.0 0.0
2014 8718 0.0 0.0 0.0
2015 8680 0.0 0.0 0.0
2016 7836 0.0 0.0 0.0
2017 8677 0.0 0.0 0.0
2018 8685 0.0 0.0 0.0
2019 7513 0.0 0.0 0.0
2020 2138 0.0 0.0 0.0

For data sources see[6]

References