X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474092802000

Well Details

Well ID: 0474092802000
Loading map...
Location: 00/02-28-047-09W4/0
Location Alias: 00/02-28-47-09 W4M
Location Alias 2: 00/02-28-047-09 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 09
Section: 28
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CVE 2A VIK-KINS 2-28-47-9
Operator Name: Cardinal Energy Ltd.
License Number: 0218630
License Date: 1998-11-12
License Status: Issued
Spud Date: 1998-11-14
Final Drill Date: 1998-12-13
Well Total Depth: 982.00 m
Surface Hole Latitude: 53.080473
Surface Hole Longitude: -111.259665

For data sources see[1][2]

Well History

Date Event
1998-11-12 Obtained License
1998-11-14 Direction Drilling Operation Performed - Deviate
1998-11-14 Surface Casing Operation Performed
1998-12-13 Finished Drilling
1998-12-14 Production Casing Operation Performed
1998-12-14 Rig Released
1998-12-14 Well Log Performed
1998-12-14 Well Mode changed to Drilled and Cased
1999-01-06 Well Log Performed
1999-03-17 Perforation Treatment Performed - Jet Perforation
1999-03-18 Well Log Performed
1999-03-26 Perforation Treatment Performed - Fractured
1999-04-22 Well Began Production
1999-04-22 Well Fluid changed to Crude Oil
1999-04-22 Well Mode changed to Pumping
2000-11-30 Well Fluid changed to Crude Oil
2000-11-30 Well Mode changed to Suspended
2001-05-25 Well Fluid changed to Crude Oil
2001-05-25 Well Mode changed to Pumping
2008-07-01 Well Fluid changed to Crude Oil
2008-07-01 Well Mode changed to Suspended
2010-01-10 Perforation Treatment Performed - Chemical Squeeze
2010-03-18 Well Fluid changed to Crude Oil
2010-03-18 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-11-14 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-17 Perforation 922.50 924.50 14
1999-03-26 Fracture 922.50 924.50 0
2010-01-10 Chemical Squeeze 922.50 924.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 6066 0.0 0.0 0.0
2000 6305 0.0 0.0 0.0
2001 5403 0.0 0.0 0.0
2002 8547 0.0 0.0 0.0
2003 8156 0.0 0.0 0.0
2004 8718 0.0 0.0 0.0
2005 8712 0.0 0.0 0.0
2006 8729 0.0 0.0 0.0
2007 4800 0.0 0.0 0.0
2010 6936 0.0 0.0 0.0
2011 8711 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8639 0.0 0.0 0.0
2014 8718 0.0 0.0 0.0
2015 8680 0.0 0.0 0.0
2016 8067 0.0 0.0 0.0
2017 8677 0.0 0.0 0.0
2018 8685 0.0 0.0 0.0
2019 8700 0.0 0.0 0.0
2020 2138 0.0 0.0 0.0

For data sources see[6]

References