X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474092801030

Well Details

Well ID: 0474092801030
Loading map...
Location: 03/01-28-047-09W4/0
Location Alias: 03/01-28-47-09 W4M
Location Alias 2: 03/01-28-047-09 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 09
Section: 28
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CVE 1C VIK-KINS 1-28-47-9
Operator Name: Cardinal Energy Ltd.
License Number: 0218629
License Date: 1998-11-12
License Status: Suspension
Spud Date: 1998-11-15
Final Drill Date: 1998-12-29
Well Total Depth: 989.00 m
Surface Hole Latitude: 53.080664
Surface Hole Longitude: -111.259349

For data sources see[1][2]

Well History

Date Event
1998-11-12 Obtained License
1998-11-15 Direction Drilling Operation Performed - Deviate
1998-11-15 Surface Casing Operation Performed
1998-12-29 Finished Drilling
1998-12-29 Production Casing Operation Performed
1998-12-29 Well Log Performed
1998-12-30 Rig Released
1998-12-30 Well Mode changed to Drilled and Cased
1999-01-11 Well Log Performed
1999-03-17 Perforation Treatment Performed - Jet Perforation
1999-03-18 Well Log Performed
1999-03-26 Perforation Treatment Performed - Fractured
1999-04-19 Well Began Production
1999-04-19 Well Fluid changed to Crude Oil
1999-04-19 Well Mode changed to Pumping
2000-11-30 Well Fluid changed to Crude Oil
2000-11-30 Well Mode changed to Suspended
2007-06-19 Well Fluid changed to Crude Oil
2007-06-19 Well Mode changed to Pumping
2013-06-01 Well Fluid changed to Crude Oil
2013-06-01 Well Mode changed to Suspended
2020-02-14 Well Fluid changed to Crude Oil
2020-02-14 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-11-15 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-17 Perforation 928.50 930.50 14
1999-03-26 Fracture 928.50 930.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4243 0.0 0.0 0.0
2000 12 0.0 0.0 0.0
2007 4280 0.0 0.0 0.0
2008 8683 0.0 0.0 0.0
2009 8698 0.0 0.0 0.0
2010 2751 0.0 0.0 0.0
2011 8711 0.0 0.0 0.0
2012 3047 0.0 0.0 0.0
2020 1106 0.0 0.0 0.0

For data sources see[6]

References