X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474091914022

Well Details

Well ID: 0474091914022
Loading map...
Location: 02/14-19-047-09W4/2
Location Alias: 02/14-19-47-09 W4M
Location Alias 2: 02/14-19-047-09 W4/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 09
Section: 19
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CVE 14D VIK-KINS 14-19-47-9
Operator Name: Cardinal Energy Ltd.
License Number: 0197300
License Date: 1997-01-28
License Status: Amended
Spud Date: 1997-01-30
Final Drill Date: 1997-02-08
Well Total Depth: 865.00 m
Surface Hole Latitude: 53.072522
Surface Hole Longitude: -111.312662

For data sources see[1][2]

Well History

Date Event
1997-01-28 Obtained License
1997-01-30 Direction Drilling Operation Performed - Deviate
1997-01-30 Surface Casing Operation Performed
1997-02-08 Finished Drilling
1997-02-08 Production Casing Operation Performed
1997-02-08 Rig Released
1997-02-08 Well Log Performed
1997-02-08 Well Mode changed to Drilled and Cased
1997-04-18 Perforation Treatment Performed - Jet Perforation
1997-04-18 Well Log Performed
1997-07-18 Well Log Performed
2004-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-24 Perforation Treatment Performed - Jet Perforation
2004-09-24 Plug Back Performed
2004-09-24 Well Log Performed
2004-11-05 Well Began Production
2004-11-05 Well Fluid changed to Crude Oil
2004-11-05 Well Mode changed to Pumping
2006-03-06 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-01-30 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-04-18 Perforation 809.50 811.00 16
1997-04-18 Perforation 805.00 807.00 16
1997-04-18 Perforation 793.00 796.00 16
1997-04-18 Perforation 788.00 792.00 16
2004-09-24 Packing Device Capped w/Cement 777.00 785.00 0
2004-09-24 Perforation 742.50 748.50 17
2006-03-06 Fracture 742.50 748.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1318 0.0 0.0 0.0
2005 8256 0.0 0.0 0.0
2006 7574 0.0 0.0 0.0
2007 7854 0.0 0.0 0.0
2008 8686 0.0 0.0 0.0
2009 8746 0.0 0.0 0.0
2010 8126 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8687 0.0 0.0 0.0
2013 8087 0.0 0.0 0.0
2014 8742 0.0 0.0 0.0
2015 8673 0.0 0.0 0.0
2016 8711 0.0 0.0 0.0
2017 8685 0.0 0.0 0.0
2018 8692 0.0 0.0 0.0
2019 7821 0.0 0.0 0.0
2020 2138 0.0 0.0 0.0

For data sources see[6]

References