X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474052510030

Well Details

Well ID: 0474052510030
Loading map...
Location: 03/10-25-047-05W4/0
Location Alias: 03/10-25-47-05 W4M
Location Alias 2: 03/10-25-047-05 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 05
Section: 25
County/Municipality: County of Vermilion River
Well Name: ENERMARK 10C WILDMERE 10-25-47-5
Operator Name: Enerplus Corporation
License Number: 0234798
License Date: 2000-03-07
License Status: Issued
Spud Date: 2000-04-08
Final Drill Date: 2000-04-10
Well Total Depth: 690.00 m
Surface Hole Latitude: 53.086997
Surface Hole Longitude: -110.603381

For data sources see[1][2]

Well History

Date Event
2000-03-07 Obtained License
2000-04-08 Surface Casing Operation Performed
2000-04-09 Direction Drilling Operation Performed - Deviate
2000-04-10 Finished Drilling
2000-04-11 Production Casing Operation Performed
2000-04-11 Rig Released
2000-04-11 Well Log Performed
2000-04-11 Well Mode changed to Drilled and Cased
2000-04-24 Well Log Performed
2000-05-01 Well Log Performed
2000-05-18 Perforation Treatment Performed - Jet Perforation
2000-05-18 Perforation Treatment Performed - Remedial Casing
2000-05-20 Perforation Treatment Performed - Jet Perforation
2000-05-20 Perforation Treatment Performed - Remedial Casing
2000-05-24 Perforation Treatment Performed - Jet Perforation
2000-06-08 Well Began Production
2000-06-08 Well Fluid changed to Crude Oil
2000-06-08 Well Mode changed to Pumping
2010-04-01 Liner Casing Operation Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-04-09 115.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-05-18 Perforation 414.00 415.00 12
2000-05-18 Remedial Casing Cementing 414.00 415.00 0
2000-05-20 Perforation 361.00 362.00 12
2000-05-20 Remedial Casing Cementing 361.00 362.00 0
2000-05-24 Perforation 640.00 648.00 13
2000-05-24 Perforation 649.50 651.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 3767 0.0 0.0 0.0
2001 8139 0.0 0.0 0.0
2002 8394 0.0 0.0 0.0
2003 8315 0.0 0.0 0.0
2004 8693 0.0 0.0 0.0
2005 8598 0.0 0.0 0.0
2006 8572 0.0 0.0 0.0
2007 7850 0.0 0.0 0.0
2008 8078 0.0 0.0 0.0
2009 8653 0.0 0.0 0.0
2010 7533 0.0 0.0 0.0
2011 8272 0.0 0.0 0.0
2012 8371 0.0 0.0 0.0
2013 7508 0.0 0.0 0.0
2014 8501 0.0 0.0 0.0
2015 8056 0.0 0.0 0.0
2016 8408 0.0 0.0 0.0
2017 8209 0.0 0.0 0.0
2018 8022 0.0 0.0 0.0
2019 8107 0.0 0.0 0.0
2020 2168 0.0 0.0 0.0

For data sources see[6]

References