X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474052508030

Well Details

Well ID: 0474052508030
Loading map...
Location: 03/08-25-047-05W4/0
Location Alias: 03/08-25-47-05 W4M
Location Alias 2: 03/08-25-047-05 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 05
Section: 25
County/Municipality: County of Vermilion River
Well Name: ENERMARK 8D WILDMERE 8-25-47-5
Operator Name: Enerplus Corporation
License Number: 0233944
License Date: 2000-02-18
License Status: Suspension
Spud Date: 2000-03-10
Final Drill Date: 2000-03-13
Well Total Depth: 647.00 m
Surface Hole Latitude: 53.080773
Surface Hole Longitude: -110.593440

For data sources see[1][2]

Well History

Date Event
2000-02-18 Obtained License
2000-03-10 Surface Casing Operation Performed
2000-03-12 Direction Drilling Operation Performed - Deviate
2000-03-13 Finished Drilling
2000-03-13 Well Log Performed
2000-03-14 Production Casing Operation Performed
2000-03-14 Rig Released
2000-03-14 Well Mode changed to Drilled and Cased
2000-03-21 Perforation Treatment Performed - Jet Perforation
2000-04-21 Well Began Production
2000-04-21 Well Fluid changed to Crude Oil
2000-04-21 Well Mode changed to Flowing
2011-04-01 Well Fluid changed to Crude Oil
2011-04-01 Well Mode changed to Suspended
2019-11-16 Well Log Performed
2020-01-22 Well Log Performed
2020-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-04 Perforation Treatment Performed - Jet Perforation
2020-02-04 Plug Back Performed
2020-02-04 Well Fluid changed to Crude Oil
2020-02-04 Well Mode changed to Abandoned Zone
2020-02-08 Perforation Treatment Performed - Cement Plug
2020-02-08 Perforation Treatment Performed - Remedial Casing
2020-02-08 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-03-12 167.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-03-21 Perforation 602.00 612.00 26
2020-02-04 Packing Device Capped w/Cement 582.70 591.80 0
2020-02-04 Perforation 565.00 567.00 20
2020-02-08 Remedial Casing Cementing 565.00 567.00 0
2020-02-08 Cement Plug 550.50 561.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5747 0.0 0.0 0.0
2001 8156 0.0 0.0 0.0
2002 8479 0.0 0.0 0.0
2003 8331 0.0 0.0 0.0
2004 8693 0.0 0.0 0.0
2005 8623 0.0 0.0 0.0
2006 6851 0.0 0.0 0.0
2007 6747 0.0 0.0 0.0
2008 7649 0.0 0.0 0.0
2009 8381 0.0 0.0 0.0
2010 2914 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-08 No Incident Encountered 0.00 0.00

For data sources see[7]

References