X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474051107020

Well Details

Well ID: 0474051107020
Loading map...
Location: 02/07-11-047-05W4/0
Location Alias: 02/07-11-47-05 W4M
Location Alias 2: 02/07-11-047-05 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 05
Section: 11
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HUSKY WILDMERE 7A-11-47-5
Operator Name: Husky Oil Operations Limited
License Number: 0046678
License Date: 1973-07-25
License Status: RecCertified
Spud Date: 1973-07-30
Final Drill Date: 1973-08-01
Well Total Depth: 601.10 m
Surface Hole Latitude: 53.035094
Surface Hole Longitude: -110.622112

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-07-25 Obtained License
1973-08-01 Finished Drilling
1973-08-01 Well Mode changed to Drilled and Cased
1973-08-02 Production Casing Operation Performed
1973-09-10 Perforation Treatment Performed - Jet Perforation
1973-09-12 Well Began Production
1973-09-12 Well Fluid changed to Crude Oil
1973-09-12 Well Mode changed to Pumping
1980-09-04 Well Fluid changed to Crude Oil
1980-09-04 Well Mode changed to Suspended
1984-08-26 Well Fluid changed to Crude Oil
1984-08-26 Well Mode changed to Pumping
1986-11-30 Well Fluid changed to Crude Oil
1986-11-30 Well Mode changed to Suspended
1998-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-29 Plug Back Performed
2000-06-01 Well Log Performed
2000-06-07 Perforation Treatment Performed - Abrasa-Jet Perforation
2000-06-07 Perforation Treatment Performed - Remedial Casing
2000-07-16 Perforation Treatment Performed - Abrasa-Jet Perforation
2000-07-16 Perforation Treatment Performed - Remedial Casing
2005-07-26 Perforation Treatment Performed - Jet Perforation
2005-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-27 Perforation Treatment Performed - Remedial Casing
2005-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-29 Perforation Treatment Performed - Cement Plug
2005-07-29 Perforation Treatment Performed - Remedial Casing
2005-07-29 Plug Back Performed
2005-07-29 Well Fluid changed to Crude Oil
2005-07-29 Well Mode changed to Abandoned Zone
2006-10-19 Perforation Treatment Performed - Jet Perforation
2006-10-20 Perforation Treatment Performed - Remedial Casing
2006-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-21 Perforation Treatment Performed - Remedial Casing
2006-10-21 Plug Back Performed
2008-06-03 Well Log Performed
2008-12-01 Perforation Treatment Performed - Jet Perforation
2008-12-01 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2008-12-01 Perforation Treatment Performed - Remedial Casing
2009-06-20 Perforation Treatment Performed - Cement Plug
2009-06-20 Plug Back Performed
2009-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-27 Perforation Treatment Performed - Jet Perforation
2009-08-27 Perforation Treatment Performed - Remedial Casing
2009-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-29 Plug Back Performed
2010-07-30 Well Log Performed
2010-08-05 Well Log Performed
2010-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-24 Well Log Performed
2010-11-07 Perforation Treatment Performed - Jet Perforation
2010-11-07 Well Log Performed
2010-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-11 Perforation Treatment Performed - Remedial Casing
2010-11-13 Perforation Treatment Performed - Jet Perforation
2010-11-13 Well Log Performed
2010-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-14 Perforation Treatment Performed - Remedial Casing
2010-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-18 Well Log Performed
2010-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-08 Well Abandoned
2011-07-08 Well Fluid changed to Crude Oil
2011-07-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-09-10 Perforation 588.90 590.70 13
2005-07-27 Packing Device Capped w/Cement 263.00 266.50 0
2005-07-29 Remedial Casing Cementing 229.00 231.00 0
2005-07-29 Packing Device Capped w/Cement 213.00 218.60 0
2005-07-29 Cement Plug 39.80 136.00 0
2006-10-19 Perforation 226.00 227.00 20
2006-10-19 Perforation 119.00 120.00 20
2006-10-20 Remedial Casing Cementing 226.00 227.00 0
2006-10-21 Remedial Casing Cementing 119.00 120.00 0
2006-10-21 Packing Device Capped w/Cement 76.00 116.50 0
2008-12-01 Perforation 306.30 309.30 20
1998-09-29 Packing Device Capped w/Cement 577.00 585.00 0
2008-12-01 Remedial Casing Cementing 306.30 309.30 0
2008-12-01 Packing Dev Cpd w/Res-Gyp Cem 297.00 305.00 0
2009-06-20 Cement Plug 13.00 297.00 0
2009-08-27 Perforation 165.00 166.00 20
2009-08-27 Remedial Casing Cementing 165.00 166.00 0
2009-08-27 Packing Device Capped w/Cement 152.00 160.00 0
2009-08-29 Packing Device Capped w/Cement 101.50 109.50 0
2010-09-16 Packing Device Capped w/Cement 488.70 497.70 0
2010-11-07 Perforation 456.00 458.00 17
2010-11-07 Perforation 454.00 456.00 17
2000-06-07 Hydra Jet Perforation 226.50 227.00 0
2010-11-11 Remedial Casing Cementing 454.00 458.00 0
2010-11-11 Packing Device Capped w/Cement 443.00 451.00 0
2010-11-13 Perforation 430.00 431.00 17
2010-11-13 Perforation 428.00 430.00 17
2010-11-14 Remedial Casing Cementing 428.00 431.00 0
2010-11-14 Packing Device Capped w/Cement 418.00 426.00 0
2010-11-16 Packing Device Capped w/Cement 287.00 300.00 0
2010-11-21 Packing Device Capped w/Cement 261.80 269.80 0
2010-11-22 Packing Device Capped w/Cement 216.00 224.00 0
2010-11-22 Packing Device Capped w/Cement 156.30 164.30 0
2000-06-07 Remedial Casing Cementing 226.50 227.00 0
2011-06-06 Packing Device Capped w/Cement 107.00 115.00 0
2000-07-16 Hydra Jet Perforation 119.50 120.00 0
2000-07-16 Remedial Casing Cementing 119.50 120.00 0
2005-07-26 Perforation 274.00 276.00 20
2005-07-26 Perforation 229.00 231.00 20
2005-07-27 Remedial Casing Cementing 274.00 276.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 1752 0.0 0.0 0.0
1974 1248 0.0 0.0 0.0
1975 4 0.0 0.0 0.0
1976 2066 0.0 0.0 0.0
1977 1106 0.0 0.0 0.0
1978 4 0.0 0.0 0.0
1984 382 0.0 0.0 0.0
1985 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-08-02 No Incident Encountered 0.00 0.00
2006-10-23 No Incident Encountered 0.00 0.00
2008-12-02 No Incident Encountered 0.00 0.00
2009-06-24 No Incident Encountered 0.00 0.00
2009-08-29 No Incident Encountered 0.00 0.00
2011-06-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References