X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474043411C00

Well Details

Well ID: 0474043411C00
Loading map...
Location: C0/11-34-047-04W4/0
Location Alias: C0/11-34-47-04 W4M
Location Alias 2: C0/11-34-047-04 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 04
Section: 34
County/Municipality: County of Vermilion River
Well Name: HUSKY WILDMERE 11C-34-47-4
Operator Name: Husky Oil Operations Limited
License Number: 0058662
License Date: 1976-06-11
License Status: RecCertified
Spud Date: 1976-06-18
Final Drill Date: 1976-06-21
Well Total Depth: 677.90 m
Surface Hole Latitude: 53.098745
Surface Hole Longitude: -110.509452

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-11 Obtained License
1976-06-21 Finished Drilling
1976-06-22 Production Casing Operation Performed
1976-06-22 Well Mode changed to Drilled and Cased
1976-07-29 Perforation Treatment Performed - Jet Perforation
2000-02-29 Perforation Treatment Performed - Jet Perforation
2000-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-01 Perforation Treatment Performed - Cement Squeeze
2000-03-01 Plug Back Performed
2000-03-01 Well Mode changed to Abandoned Zone
2001-03-04 Well Log Performed
2001-04-23 Perforation Treatment Performed - Jet Perforation
2001-04-23 Perforation Treatment Performed - Remedial Casing
2001-04-23 Well Log Performed
2005-09-26 Perforation Treatment Performed - Cement Squeeze
2005-09-26 Perforation Treatment Performed - Jet Perforation
2005-09-26 Plug Back Performed
2006-09-14 Perforation Treatment Performed - Cement Plug
2006-09-14 Plug Back Performed
2006-09-15 Perforation Treatment Performed - Jet Perforation
2006-09-24 Perforation Treatment Performed - Cement Squeeze
2006-09-24 Plug Back Performed
2008-05-26 Well Log Performed
2008-10-15 Perforation Treatment Performed - Jet Perforation
2008-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-16 Perforation Treatment Performed - Remedial Casing
2008-10-16 Plug Back Performed
2009-07-28 Perforation Treatment Performed - Fractured
2009-07-28 Perforation Treatment Performed - Jet Perforation
2009-07-29 Perforation Treatment Performed - Remedial Casing
2009-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-06 Plug Back Performed
2009-10-26 Perforation Treatment Performed - Fractured
2009-10-26 Perforation Treatment Performed - Jet Perforation
2009-10-27 Perforation Treatment Performed - Remedial Casing
2009-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-28 Perforation Treatment Performed - Jet Perforation
2009-10-28 Perforation Treatment Performed - Remedial Casing
2009-10-28 Plug Back Performed
2010-02-03 Perforation Treatment Performed - Jet Perforation
2010-02-03 Perforation Treatment Performed - Remedial Casing
2010-02-22 Well Log Performed
2010-04-19 Perforation Treatment Performed - Jet Perforation
2010-04-19 Well Log Performed
2010-04-21 Perforation Treatment Performed - Remedial Casing
2010-09-29 Well Log Performed
2010-10-04 Well Log Performed
2010-10-21 Perforation Treatment Performed - Jet Perforation
2010-10-21 Well Log Performed
2010-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-23 Perforation Treatment Performed - Cement Plug
2010-10-23 Perforation Treatment Performed - Remedial Casing
2011-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-29 Perforation Treatment Performed - Jet Perforation
2011-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-08 Perforation Treatment Performed - Remedial Casing
2011-09-10 Perforation Treatment Performed - Jet Perforation
2011-09-10 Well Log Performed
2011-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-11 Well Log Performed
2011-09-14 Well Log Performed
2011-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-15 Perforation Treatment Performed - Remedial Casing
2011-09-16 Perforation Treatment Performed - Jet Perforation
2011-09-16 Well Log Performed
2011-09-18 Perforation Treatment Performed - Remedial Casing
2011-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-21 Plug Back Performed
2011-10-28 Well Abandoned
2011-10-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-07-29 Perforation 563.00 564.80 7
2006-09-15 Perforation 325.00 326.00 20
2006-09-24 Cement Squeeze 325.00 326.00 0
2008-10-15 Perforation 459.00 460.00 20
2008-10-16 Acid Treatment 459.00 460.00 0
2008-10-16 Remedial Casing Cementing 459.00 460.00 0
2008-10-16 Packing Device Capped w/Cement 440.00 455.20 0
2009-07-28 Perforation 413.00 415.00 20
2009-07-28 Fracture 413.00 415.00 0
2009-07-29 Remedial Casing Cementing 413.00 415.00 0
2009-08-06 Packing Device Capped w/Cement 197.40 410.20 0
2000-02-29 Perforation 562.40 564.60 29
2009-10-26 Perforation 480.00 481.00 20
2009-10-26 Fracture 480.00 481.00 0
2009-10-27 Remedial Casing Cementing 480.00 481.00 0
2009-10-28 Perforation 475.00 476.00 20
2009-10-28 Remedial Casing Cementing 475.00 476.00 0
2009-10-28 Packing Device Capped w/Cement 457.80 478.00 0
2010-02-03 Perforation 480.00 481.00 20
2010-02-03 Remedial Casing Cementing 480.00 481.00 0
2010-04-19 Perforation 651.50 653.60 17
2010-04-21 Remedial Casing Cementing 651.50 653.60 0
2000-03-01 Acid Treatment 562.40 564.60 0
2010-10-21 Perforation 648.60 653.60 17
2010-10-23 Remedial Casing Cementing 648.60 653.60 0
2010-10-23 Cement Plug 641.80 655.20 0
2010-10-23 Packing Device Capped w/Cement 610.30 641.80 0
2011-08-27 Packing Device Capped w/Cement 548.00 556.00 0
2011-08-28 Packing Device Capped w/Cement 469.00 477.00 0
2011-08-28 Packing Device Capped w/Cement 443.00 451.00 0
2011-08-29 Perforation 363.00 364.00 16
2011-09-07 Acid Treatment 363.00 364.00 0
2011-09-08 Remedial Casing Cementing 363.00 364.00 0
2000-03-01 Cement Squeeze 562.40 564.60 0
2011-09-08 Packing Device Capped w/Cement 345.50 362.30 0
2011-09-10 Perforation 341.50 344.50 20
2011-09-10 Perforation 328.00 329.00 20
2011-09-11 Packing Device Capped w/Cement 331.70 340.00 0
2011-09-15 Remedial Casing Cementing 328.00 329.00 0
2011-09-15 Packing Device Capped w/Cement 310.00 319.00 0
2011-09-16 Perforation 115.00 117.00 21
2011-09-18 Remedial Casing Cementing 115.00 117.00 0
2011-10-21 Packing Device Capped w/Cement 105.00 113.00 0
2001-04-23 Perforation 359.50 361.50 39
2001-04-23 Remedial Casing Cementing 359.50 361.50 0
2005-09-26 Perforation 373.00 375.00 20
2005-09-26 Cement Squeeze 373.00 375.00 0
2006-09-14 Cement Plug 340.00 341.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-10-17 No Incident Encountered 0.00 0.00
2009-08-06 No Incident Encountered 0.00 0.00
2009-10-29 No Incident Encountered 0.00 0.00
2010-02-12 No Incident Encountered 0.00 0.00
2010-04-22 No Incident Encountered 0.00 0.00
2010-10-25 No Incident Encountered 0.00 0.00
2011-10-21 No Incident Encountered 0.00 0.00

For data sources see[5]

References