X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474041608000

Well Details

Well ID: 0474041608000
Loading map...
Location: 00/08-16-047-04W4/0
Location Alias: 00/08-16-47-04 W4M
Location Alias 2: 00/08-16-047-04 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 04
Section: 16
County/Municipality: County of Vermilion River
Well Name: HUSKY ET AL WILDMERE 8C-16-47-4
Operator Name: Husky Oil Operations Limited
License Number: 0113929
License Date: 1985-03-13
License Status: Abandoned
Spud Date: 1985-03-13
Final Drill Date: 1985-03-16
Well Total Depth: 702.00 m
Surface Hole Latitude: 53.051750
Surface Hole Longitude: -110.521295

For data sources see[1][2]

Well History

Date Event
1985-03-13 Obtained License
1985-03-14 Surface Casing Operation Performed
1985-03-16 Finished Drilling
1985-03-16 Lost Circulation Occurred
1985-03-18 Well Log Performed
1985-03-19 Plug Back Performed
1985-03-19 Rig Released
1985-03-19 Well Mode changed to Abandoned
2010-02-09 Well Log Performed
2011-02-27 Perforation Treatment Performed - Cement Plug
2011-02-27 Plug Back Performed
2011-02-27 Production Casing Operation Performed
2011-08-22 Well Log Performed
2011-08-23 Perforation Treatment Performed - Jet Perforation
2011-08-23 Well Log Performed
2011-08-25 Well Log Performed
2011-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-26 Perforation Treatment Performed - Remedial Casing
2011-08-29 Perforation Treatment Performed - Jet Perforation
2011-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-06 Well Log Performed
2011-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-07 Perforation Treatment Performed - Remedial Casing
2011-09-08 Well Log Performed
2011-09-09 Perforation Treatment Performed - Jet Perforation
2011-09-09 Well Log Performed
2011-09-12 Well Log Performed
2011-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-13 Perforation Treatment Performed - Remedial Casing
2011-09-14 Perforation Treatment Performed - Jet Perforation
2011-09-14 Well Log Performed
2011-09-16 Well Log Performed
2011-09-19 Well Log Performed
2011-10-19 Well Log Performed
2011-10-31 Well Log Performed
2011-11-03 Well Log Performed
2011-11-05 Perforation Treatment Performed - Remedial Casing
2011-11-06 Well Log Performed
2012-02-13 Well Log Performed
2012-06-11 Well Log Performed
2012-06-12 Perforation Treatment Performed - Jet Perforation
2012-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-06-18 Perforation Treatment Performed - Jet Perforation
2012-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-19 Plug Back Performed
2012-06-22 Perforation Treatment Performed - Remedial Casing
2014-10-30 Well Log Performed
2014-11-04 Perforation Treatment Performed - Jet Perforation
2014-11-04 Well Log Performed
2014-11-05 Perforation Treatment Performed - Bridge Plug No Cement Required
2014-11-06 Perforation Treatment Performed - Remedial Casing
2017-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-11-22 Perforation Treatment Performed - Cement Plug
2017-11-22 Plug Back Performed
2017-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-11-23 Perforation Treatment Performed - Cement Plug
2017-11-23 Plug Back Performed
2017-12-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-27 Cement Plug 673.00 681.00 0
2011-09-09 Perforation 341.00 344.00 20
2011-09-09 Perforation 341.00 344.00 17
2011-09-13 Remedial Casing Cementing 341.00 344.00 0
2011-09-13 Packing Device Capped w/Cement 326.70 339.50 0
2011-09-14 Perforation 223.00 226.00 20
2011-11-05 Remedial Casing Cementing 223.00 226.00 0
2012-06-12 Perforation 195.00 198.00 17
2012-06-15 Acid Treatment 195.00 198.00 0
2012-06-18 Perforation 195.00 195.90 99
2012-06-19 Packing Device Capped w/Cement 208.50 217.50 0
2011-08-23 Perforation 571.00 574.00 20
2012-06-22 Remedial Casing Cementing 195.00 198.00 0
2014-11-04 Perforation 339.00 342.00 20
2014-11-05 Bridge Plug, No Cement 335.70 336.70 0
2014-11-06 Remedial Casing Cementing 339.00 342.00 0
2017-11-22 Cement Plug 327.60 335.60 0
2017-11-22 Packing Device Capped w/Cement 211.80 219.80 0
2017-11-23 Cement Plug 192.40 198.00 0
2017-11-23 Packing Device Capped w/Cement 183.80 191.80 0
2011-08-26 Remedial Casing Cementing 571.00 574.00 0
2011-08-26 Packing Device Capped w/Cement 561.00 570.00 0
2011-08-29 Perforation 542.00 545.00 20
2011-08-29 Perforation 543.00 545.00 20
2011-08-31 Acid Treatment 542.00 545.00 0
2011-09-07 Remedial Casing Cementing 542.00 545.00 0
2011-09-07 Packing Device Capped w/Cement 523.10 532.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-03-16 Lost Circulation 702.00 702.00
2011-03-01 No Incident Encountered 0.00 0.00
2012-02-13 No Incident Encountered 0.00 0.00
2012-06-23 No Incident Encountered 0.00 0.00
2014-10-22 No Incident Encountered 0.00 0.00
2017-11-16 No Incident Encountered 0.00 0.00
2017-11-23 No Incident Encountered 0.00 0.00

For data sources see[5]

References