X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474013615002

Well Details

Well ID: 0474013615002
Loading map...
Location: 00/15-36-047-01W4/2
Location Alias: 00/15-36-47-01 W4M
Location Alias 2: 00/15-36-047-01 W4/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 01
Section: 36
County/Municipality: County of Vermilion River
Well Name: CNRL RIVERCOURSE 15-36-47-1
Operator Name: Canadian Natural Resources Limited
License Number: 0069793
License Date: 1978-05-29
License Status: Suspension
Spud Date: 1978-06-05
Final Drill Date: 1978-06-07
Well Total Depth: 693.40 m
Surface Hole Latitude: 53.102343
Surface Hole Longitude: -110.016176

For data sources see[1][2]

Well History

Date Event
1978-05-29 Obtained License
1978-06-07 Finished Drilling
1978-06-07 Well Mode changed to Drilled and Cased
1978-06-08 Production Casing Operation Performed
1978-06-08 Well Log Performed
1978-06-20 Well Log Performed
1978-06-22 Perforation Treatment Performed - Jet Perforation
1978-06-30 Well Log Performed
1978-07-11 Well Log Performed
1995-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-21 Perforation Treatment Performed - Jet Perforation
1995-12-21 Plug Back Performed
1995-12-21 Well Log Performed
1996-01-01 Well Began Production
1996-01-01 Well Fluid changed to Crude Oil
1996-01-01 Well Mode changed to Pumping
2001-05-31 Well Fluid changed to Crude Oil
2001-05-31 Well Mode changed to Suspended
2008-06-01 Well Fluid changed to Crude Oil
2008-06-01 Well Mode changed to Pumping
2008-06-06 Perforation Treatment Performed - Chemical Squeeze
2008-10-23 Perforation Treatment Performed - Casing Patch (Over Perfs)
2017-09-30 Well Fluid changed to Crude Oil
2017-09-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-06-22 Perforation 636.10 637.60 13
1995-12-21 Packing Device Capped w/Cement 617.10 625.10 0
1995-12-21 Perforation 532.80 533.70 26
1995-12-21 Perforation 535.20 536.80 26
2008-06-06 Chemical Squeeze 532.80 536.80 0
2008-10-23 Casing Patch 532.80 533.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 8771 0.0 0.0 0.0
1997 8343 0.0 0.0 0.0
1998 8689 0.0 0.0 0.0
1999 8704 0.0 0.0 0.0
2000 7196 0.0 0.0 0.0
2008 4852 0.0 0.0 0.0
2009 7937 0.0 0.0 0.0
2010 7510 0.0 0.0 0.0
2011 8509 0.0 0.0 0.0
2012 8449 0.0 0.0 0.0
2013 8172 0.0 0.0 0.0
2014 8435 0.0 0.0 0.0
2015 7266 0.0 0.0 0.0
2016 8141 0.0 0.0 0.0
2017 4973 0.0 0.0 0.0

For data sources see[5]

References