If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465113116000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.001448,"lon":-115.58038,"icon":""}]} |
Location: 00/16-31-046-11W5/0 | |
Location Alias: 00/16-31-46-11 W5M | |
Location Alias 2: 00/16-31-046-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 11 | |
Section: 31 | |
County/Municipality: Brazeau County | |
Well Name: SDEL HZ BRAZR 16-31-46-11 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0443228 | |
License Date: 2012-01-24 | |
License Status: Issued | |
Spud Date: 2012-03-13 | |
Final Drill Date: 2012-03-22 | |
Well Total Depth: 3627.00 m | |
Surface Hole Latitude: 53.001448 | |
Surface Hole Longitude: -115.580380 |
Date | Event |
---|---|
2012-01-24 | Obtained License |
2012-03-15 | Surface Casing Operation Performed |
2012-03-16 | Direction Drilling Operation Performed - Deviate |
2012-03-18 | Direction Drilling Operation Performed - Horizontal |
2012-03-18 | Well Log Performed |
2012-03-22 | Finished Drilling |
2012-03-22 | Well Log Performed |
2012-03-22 | Well Mode changed to Drilled and Cased |
2012-03-25 | Production Casing Operation Performed |
2012-03-25 | Rig Released |
2012-04-18 | Well Began Production |
2012-04-18 | Well Fluid changed to Crude Oil |
2012-04-18 | Well Mode changed to Pumping |
2012-04-19 | Well Log Performed |
2012-04-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-04-25 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-14 | Nabors Drilling Limited | 32 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-16 | 1523.00 | Deviate (5 - 79 degrees) |
2012-03-18 | 2193.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-04-25 | Open Hole/Barefoot Completion | 3622.00 | 3627.00 | 0 |
2012-04-25 | Multi-Stage Fracture | 3031.70 | 3031.80 | 0 |
2012-04-25 | Multi-Stage Fracture | 2957.80 | 2957.90 | 0 |
2012-04-25 | Multi-Stage Fracture | 2896.70 | 2896.80 | 0 |
2012-04-25 | Multi-Stage Fracture | 2823.50 | 2823.60 | 0 |
2012-04-25 | Multi-Stage Fracture | 2749.20 | 2749.30 | 0 |
2012-04-25 | Multi-Stage Fracture | 2686.70 | 2686.80 | 0 |
2012-04-25 | Multi-Stage Fracture | 2612.00 | 2612.10 | 0 |
2012-04-25 | Multi-Stage Fracture | 2539.40 | 2539.50 | 0 |
2012-04-25 | Multi-Stage Fracture | 2477.90 | 2478.00 | 0 |
2012-04-25 | Multi-Stage Fracture | 2404.10 | 2404.20 | 0 |
2012-04-25 | Multi-Stage Fracture | 3589.70 | 3589.80 | 0 |
2012-04-25 | Multi-Stage Fracture | 2331.40 | 2331.50 | 0 |
2012-04-25 | Multi-Stage Fracture | 3521.40 | 3521.50 | 0 |
2012-04-25 | Multi-Stage Fracture | 3448.20 | 3448.30 | 0 |
2012-04-25 | Multi-Stage Fracture | 3386.20 | 3386.30 | 0 |
2012-04-25 | Multi-Stage Fracture | 3313.60 | 3313.70 | 0 |
2012-04-25 | Multi-Stage Fracture | 3239.40 | 3239.50 | 0 |
2012-04-25 | Multi-Stage Fracture | 3166.40 | 3166.50 | 0 |
2012-04-25 | Multi-Stage Fracture | 3105.10 | 3105.20 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5636 | 0.0 | 0.0 | 0.0 |
2013 | 8650 | 0.0 | 0.0 | 0.0 |
2014 | 8741 | 0.0 | 0.0 | 0.0 |
2015 | 8641 | 0.0 | 0.0 | 0.0 |
2016 | 8065 | 0.0 | 0.0 | 0.0 |
2017 | 7818 | 0.0 | 0.0 | 0.0 |
2018 | 2683 | 0.0 | 0.0 | 0.0 |
2019 | 1680 | 0.0 | 0.0 | 0.0 |
2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-25 | No Incident Encountered | 0.00 | 0.00 |
2012-05-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]