X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465113116000

Well Details

Well ID: 0465113116000
Loading map...
Location: 00/16-31-046-11W5/0
Location Alias: 00/16-31-46-11 W5M
Location Alias 2: 00/16-31-046-11 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 11
Section: 31
County/Municipality: Brazeau County
Well Name: SDEL HZ BRAZR 16-31-46-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0443228
License Date: 2012-01-24
License Status: Issued
Spud Date: 2012-03-13
Final Drill Date: 2012-03-22
Well Total Depth: 3627.00 m
Surface Hole Latitude: 53.001448
Surface Hole Longitude: -115.580380

For data sources see[1][2]

Well History

Date Event
2012-01-24 Obtained License
2012-03-15 Surface Casing Operation Performed
2012-03-16 Direction Drilling Operation Performed - Deviate
2012-03-18 Direction Drilling Operation Performed - Horizontal
2012-03-18 Well Log Performed
2012-03-22 Finished Drilling
2012-03-22 Well Log Performed
2012-03-22 Well Mode changed to Drilled and Cased
2012-03-25 Production Casing Operation Performed
2012-03-25 Rig Released
2012-04-18 Well Began Production
2012-04-18 Well Fluid changed to Crude Oil
2012-04-18 Well Mode changed to Pumping
2012-04-19 Well Log Performed
2012-04-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-25 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-14 Nabors Drilling Limited 32 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-16 1523.00 Deviate (5 - 79 degrees)
2012-03-18 2193.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-25 Open Hole/Barefoot Completion 3622.00 3627.00 0
2012-04-25 Multi-Stage Fracture 3031.70 3031.80 0
2012-04-25 Multi-Stage Fracture 2957.80 2957.90 0
2012-04-25 Multi-Stage Fracture 2896.70 2896.80 0
2012-04-25 Multi-Stage Fracture 2823.50 2823.60 0
2012-04-25 Multi-Stage Fracture 2749.20 2749.30 0
2012-04-25 Multi-Stage Fracture 2686.70 2686.80 0
2012-04-25 Multi-Stage Fracture 2612.00 2612.10 0
2012-04-25 Multi-Stage Fracture 2539.40 2539.50 0
2012-04-25 Multi-Stage Fracture 2477.90 2478.00 0
2012-04-25 Multi-Stage Fracture 2404.10 2404.20 0
2012-04-25 Multi-Stage Fracture 3589.70 3589.80 0
2012-04-25 Multi-Stage Fracture 2331.40 2331.50 0
2012-04-25 Multi-Stage Fracture 3521.40 3521.50 0
2012-04-25 Multi-Stage Fracture 3448.20 3448.30 0
2012-04-25 Multi-Stage Fracture 3386.20 3386.30 0
2012-04-25 Multi-Stage Fracture 3313.60 3313.70 0
2012-04-25 Multi-Stage Fracture 3239.40 3239.50 0
2012-04-25 Multi-Stage Fracture 3166.40 3166.50 0
2012-04-25 Multi-Stage Fracture 3105.10 3105.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5636 0.0 0.0 0.0
2013 8650 0.0 0.0 0.0
2014 8741 0.0 0.0 0.0
2015 8641 0.0 0.0 0.0
2016 8065 0.0 0.0 0.0
2017 7818 0.0 0.0 0.0
2018 2683 0.0 0.0 0.0
2019 1680 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-25 No Incident Encountered 0.00 0.00
2012-05-05 No Incident Encountered 0.00 0.00

For data sources see[8]

References