X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465110315000

Well Details

Well ID: 0465110315000
Loading map...
Location: 00/15-03-046-11W5/0
Location Alias: 00/15-03-46-11 W5M
Location Alias 2: 00/15-03-046-11 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 11
Section: 03
County/Municipality: Brazeau County
Well Name: BELLATRIX HZ PEMBINA 15-3-46-11
Operator Name: Bellatrix Exploration Ltd.
License Number: 0445057
License Date: 2012-03-21
License Status: Amended
Spud Date: 2012-10-24
Final Drill Date: 2012-11-21
Well Total Depth: 5514.00 m
Surface Hole Latitude: 52.913168
Surface Hole Longitude: -115.499353

For data sources see[1][2]

Well History

Date Event
2011-11-08 Well Log Performed
2012-03-21 Obtained License
2012-10-29 Surface Casing Operation Performed
2012-11-02 Direction Drilling Operation Performed - Deviate
2012-11-04 Direction Drilling Operation Performed - Horizontal
2012-11-05 Well Log Performed
2012-11-06 Lost Circulation Occurred
2012-11-07 Intermediate Casing Operation Performed
2012-11-08 Well Log Performed
2012-11-21 Finished Drilling
2012-11-21 Well Log Performed
2012-11-21 Well Mode changed to Drilled and Cased
2012-11-24 Liner Casing Operation Performed
2012-11-26 Rig Released
2012-12-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-04 Perforation Treatment Performed - Open-Hole Completion
2012-12-04 Well Began Production
2012-12-04 Well Fluid changed to Crude Oil
2012-12-04 Well Mode changed to Pumping
2012-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-11 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-24 Chinook Drilling Inc. 15 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-11-02 1520.00 Deviate (5 - 79 degrees)
2012-11-04 2231.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-04 Open Hole/Barefoot Completion 5509.00 5514.00 0
2012-12-04 Multi-Stage Fracture 4844.00 4844.10 0
2012-12-04 Multi-Stage Fracture 4761.40 4761.50 0
2012-12-04 Multi-Stage Fracture 4689.30 4689.40 0
2012-12-04 Multi-Stage Fracture 4600.20 4600.30 0
2012-12-04 Multi-Stage Fracture 4522.10 4522.20 0
2012-12-04 Multi-Stage Fracture 4444.20 4444.30 0
2012-12-04 Multi-Stage Fracture 4365.60 4365.70 0
2012-12-04 Multi-Stage Fracture 4287.90 4288.00 0
2012-12-04 Multi-Stage Fracture 4197.80 4197.90 0
2012-12-04 Multi-Stage Fracture 4120.20 4120.30 0
2012-12-04 Multi-Stage Fracture 5487.00 5487.10 0
2012-12-04 Multi-Stage Fracture 4043.40 4043.50 0
2012-12-09 Multi-Stage Fracture 3968.90 3969.00 0
2012-12-09 Multi-Stage Fracture 3884.20 3884.30 0
2012-12-09 Multi-Stage Fracture 3798.20 3798.30 0
2012-12-09 Multi-Stage Fracture 3726.90 3727.00 0
2012-12-09 Multi-Stage Fracture 3641.80 3641.90 0
2012-12-09 Multi-Stage Fracture 3556.70 3556.80 0
2012-12-09 Multi-Stage Fracture 3486.60 3486.70 0
2012-12-09 Multi-Stage Fracture 3402.40 3402.50 0
2012-12-09 Multi-Stage Fracture 3315.60 3315.70 0
2012-12-04 Multi-Stage Fracture 5406.00 5406.10 0
2012-12-09 Multi-Stage Fracture 3242.50 3242.60 0
2012-12-09 Multi-Stage Fracture 3156.60 3156.70 0
2012-12-09 Multi-Stage Fracture 3082.70 3082.80 0
2012-12-09 Multi-Stage Fracture 2995.90 2996.00 0
2012-12-09 Multi-Stage Fracture 2922.00 2922.10 0
2012-12-09 Multi-Stage Fracture 2836.00 2836.10 0
2012-12-09 Multi-Stage Fracture 2763.00 2763.10 0
2012-12-09 Multi-Stage Fracture 2675.30 2675.40 0
2012-12-11 Multi-Stage Fracture 2601.40 2601.50 0
2012-12-11 Multi-Stage Fracture 2527.50 2527.60 0
2012-12-04 Multi-Stage Fracture 5319.50 5319.60 0
2012-12-04 Multi-Stage Fracture 5245.60 5245.70 0
2012-12-04 Multi-Stage Fracture 5171.70 5171.80 0
2012-12-04 Multi-Stage Fracture 5088.20 5088.30 0
2012-12-04 Multi-Stage Fracture 5006.50 5006.60 0
2012-12-04 Multi-Stage Fracture 4926.40 4926.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 561 0.0 0.0 0.0
2013 8121 0.0 0.0 0.0
2014 8497 0.0 0.0 0.0
2015 8279 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8176 0.0 0.0 0.0
2018 8555 0.0 0.0 0.0
2019 6358 0.0 0.0 0.0
2020 2015 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-06 Lost Circulation 2471.00 2471.00
2012-12-19 No Incident Encountered 0.00 0.00

For data sources see[8]

References