X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465092614020

Well Details

Well ID: 0465092614020
Loading map...
Location: 02/14-26-046-09W5/0
Location Alias: 02/14-26-46-09 W5M
Location Alias 2: 02/14-26-046-09 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 09
Section: 26
County/Municipality: Clearwater County
Well Name: BONTERRA 102 PEMBINA 14-26-46-9
Operator Name: Bonterra Energy Corp.
License Number: 0035436
License Date: 1968-12-16
License Status: Issued
Spud Date: 1968-12-18
Final Drill Date: 1968-12-25
Well Total Depth: 1312.20 m
Surface Hole Latitude: 53.000193
Surface Hole Longitude: -115.202576

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-12-16 Obtained License
1968-12-25 Finished Drilling
1968-12-25 Well Mode changed to Drilled and Cased
1968-12-26 Drill Stem Test Performed
1968-12-27 Drill Stem Test Performed
1968-12-31 Production Casing Operation Performed
1969-01-09 Perforation Treatment Performed - Jet Perforation
1969-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-01-16 Well Began Production
1969-01-16 Well Fluid changed to Crude Oil
1969-01-16 Well Mode changed to Flowing
1972-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-03 Well Fluid changed to Crude Oil
1975-06-03 Well Mode changed to Pumping
1982-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-20 Perforation Treatment Performed - Fractured
1992-01-09 Perforation Treatment Performed - Jet Perforation
1992-01-10 Perforation Treatment Performed - Remedial Casing
1992-01-11 Perforation Treatment Performed - Jet Perforation
1992-01-11 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-01-09 Perforation 1257.00 1258.20 13
1992-01-11 Perforation 199.60 199.90 39
1992-01-11 Remedial Casing Cementing 199.60 199.90 0
1969-01-09 Perforation 1260.30 1261.60 13
1969-01-09 Perforation 1262.20 1264.00 13
1969-01-12 Acid Treatment 1257.00 1264.00 0
1972-08-24 Acid Treatment 1257.00 1264.00 0
1982-07-17 Acid Treatment 1257.00 1264.00 0
1982-07-20 Fracture 1257.00 1264.00 0
1992-01-09 Perforation 200.00 200.30 39
1992-01-10 Remedial Casing Cementing 200.00 200.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 1512 0.0 0.0 0.0
1970 4583 0.0 0.0 0.0
1971 8184 0.0 0.0 0.0
1972 6272 0.0 0.0 0.0
1973 7417 0.0 0.0 0.0
1974 7920 0.0 0.0 0.0
1975 8304 0.0 0.0 0.0
1976 8399 0.0 0.0 0.0
1977 8567 0.0 0.0 0.0
1978 8687 0.0 0.0 0.0
1979 8687 0.0 0.0 0.0
1980 8783 0.0 0.0 0.0
1981 8088 0.0 0.0 0.0
1982 7751 0.0 0.0 0.0
1983 7526 0.0 0.0 0.0
1984 8544 0.0 0.0 0.0
1985 8615 0.0 0.0 0.0
1986 8027 0.0 0.0 0.0
1987 8508 0.0 0.0 0.0
1988 8019 0.0 0.0 0.0
1989 8303 0.0 0.0 0.0
1990 8279 0.0 0.0 0.0
1991 7795 0.0 0.0 0.0
1992 7992 0.0 0.0 0.0
1993 8544 0.0 0.0 0.0
1994 8151 0.0 0.0 0.0
1995 8651 0.0 0.0 0.0
1996 8735 0.0 0.0 0.0
1997 8735 0.0 0.0 0.0
1998 6211 0.0 0.0 0.0
1999 8694 0.0 0.0 0.0
2000 7925 0.0 0.0 0.0
2001 8021 0.0 0.0 0.0
2002 6507 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8347 0.0 0.0 0.0
2005 8419 0.0 0.0 0.0
2006 7821 0.0 0.0 0.0
2007 8435 0.0 0.0 0.0
2008 8100 0.0 0.0 0.0
2009 8074 0.0 0.0 0.0
2010 7498 0.0 0.0 0.0
2011 8447 0.0 0.0 0.0
2012 8603 0.0 0.0 0.0
2013 8642 0.0 0.0 0.0
2014 8376 0.0 0.0 0.0
2015 8658 0.0 0.0 0.0
2016 8460 0.0 0.0 0.0
2017 8438 0.0 0.0 0.0
2018 8284 0.0 0.0 0.0
2019 8151 0.0 0.0 0.0
2020 2064 0.0 0.0 0.0

For data sources see[5]

References