X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465073408000

Well Details

Well ID: 0465073408000
Loading map...
Location: 00/08-34-046-07W5/0
Location Alias: 00/08-34-46-07 W5M
Location Alias 2: 00/08-34-046-07 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 07
Section: 34
County/Municipality: County of Wetaskiwin No. 10
Well Name: BIRCHILL PEMBINA IN 8-34-46-7
Operator Name: Bonterra Energy Corp.
License Number: 0012655
License Date: 1956-11-14
License Status: Suspension
Spud Date: 1956-11-16
Final Drill Date: 1956-11-30
Well Total Depth: 1603.20 m
Surface Hole Latitude: 53.009518
Surface Hole Longitude: -114.923002

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-11-14 Obtained License
1956-11-30 Finished Drilling
1956-11-30 Production Casing Operation Performed
1956-11-30 Well Mode changed to Drilled and Cased
1956-12-04 Perforation Treatment Performed - Jet Perforation
1956-12-05 Perforation Treatment Performed - Fractured
1957-02-17 Well Began Production
1957-02-17 Well Fluid changed to Crude Oil
1957-02-17 Well Mode changed to Flowing
1957-12-01 Well Began Injection
1957-12-01 Well Fluid changed to Water
1957-12-01 Well Type changed to Injection
1959-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-29 Perforation Treatment Performed - Fractured
1977-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-12 Well Fluid changed to Water
2004-11-12 Well Mode changed to Suspended
2004-11-12 Well Type changed to Injection
2008-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-05 Plug Back Performed
2008-07-05 Well Fluid changed to Water
2008-07-05 Well Log Performed
2008-07-05 Well Mode changed to Abandoned Zone
2008-07-05 Well Type changed to Injection
2008-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-06 Perforation Treatment Performed - Bridge Plug No Cement Required
2008-07-06 Plug Back Performed
2008-07-06 Well Log Performed
2008-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-19 Plug Back Performed
2008-07-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-12-04 Perforation 1574.00 1577.60 13
2008-07-19 Packing Device Capped w/Cement 863.00 871.00 0
1956-12-04 Perforation 1580.40 1582.80 13
1956-12-05 Fracture 1574.00 1582.80 0
1959-09-29 Acid Treatment 1574.00 1582.80 0
1959-09-29 Fracture 1574.00 1582.80 0
1977-01-07 Acid Treatment 1574.00 1582.80 0
2008-07-05 Packing Device Capped w/Cement 1562.00 1570.00 0
2008-07-06 Packing Device Capped w/Cement 892.00 900.00 0
2008-07-06 Bridge Plug, No Cement 884.00 885.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

References