X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464283508000

Well Details

Well ID: 0464283508000
Loading map...
Location: 00/08-35-046-28W4/0
Location Alias: 00/08-35-46-28 W4M
Location Alias 2: 00/08-35-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 35
County/Municipality: Pigeon Lake 138A
Well Name: ESSO PIGEON LAKE NO. 8-35
Operator Name: Imperial Oil Resources Limited
License Number: 0007565
License Date: 1954-01-08
License Status: Abandoned
Spud Date: 1954-01-21
Final Drill Date: 1954-02-26
Well Total Depth: 2160.70 m
Surface Hole Latitude: 53.008789
Surface Hole Longitude: -113.949195

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-01-08 Obtained License
1954-02-20 Liner Casing Operation Performed
1954-02-26 Finished Drilling
1954-02-26 Well Mode changed to Drilled and Cased
1954-03-01 Perforation Treatment Performed - Bullet Perforation
1954-03-01 Perforation Treatment Performed - Jet Perforation
1954-03-03 Well Began Production
1954-03-03 Well Fluid changed to Crude Oil
1954-03-03 Well Mode changed to Flowing
1972-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-25 Well Fluid changed to Crude Oil
1981-02-25 Well Mode changed to Pumping
1986-07-15 Perforation Treatment Performed - Cement Squeeze
1986-07-18 Well Log Performed
1986-07-21 Perforation Treatment Performed - Jet Perforation
1986-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-29 Perforation Treatment Performed - Jet Perforation
1988-01-29 Well Log Performed
1988-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-31 Well Log Performed
1989-11-01 Perforation Treatment Performed - Cement Squeeze
1989-11-02 Well Log Performed
1989-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-03 Perforation Treatment Performed - Jet Perforation
1992-03-23 Perforation Treatment Performed - Jet Perforation
1992-03-23 Well Log Performed
1992-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-03 Well Fluid changed to Crude Oil
1993-08-03 Well Mode changed to Suspended
1994-06-19 Perforation Treatment Performed - Cement Squeeze
1994-06-20 Perforation Treatment Performed - Jet Perforation
1994-06-29 Well Fluid changed to Crude Oil
1994-06-29 Well Mode changed to Pumping
1997-03-28 Perforation Treatment Performed - Jet Perforation
1997-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-01 Well Fluid changed to Crude Oil
1998-09-01 Well Mode changed to Suspended
2002-04-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-04-25 Plug Back Performed
2002-04-25 Well Fluid changed to Crude Oil
2002-04-25 Well Mode changed to Abandoned Zone
2002-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-12 Plug Back Performed
2002-05-14 Perforation Treatment Performed - Jet Perforation
2002-05-14 Perforation Treatment Performed - Remedial Casing
2002-05-14 Well Log Performed
2002-12-09 Well Abandoned
2002-12-09 Well Fluid changed to Crude Oil
2002-12-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-03-01 Bullet Perforation 2150.10 2156.20 13
1989-11-01 Cement Squeeze 2153.90 2154.90 0
1989-11-03 Perforation 2150.10 2152.40 13
1989-11-03 Acid Treatment 2150.10 2152.40 0
1992-03-23 Perforation 2143.40 2143.90 13
1992-03-24 Acid Treatment 2143.40 2143.90 0
1994-06-19 Cement Squeeze 2143.40 2143.90 0
1994-06-20 Perforation 2135.30 2135.90 9
1997-03-28 Perforation 2113.00 2114.00 17
1997-03-28 Perforation 2118.60 2119.60 17
1997-03-28 Perforation 2123.20 2124.20 17
1954-03-01 Perforation 2150.10 2156.20 13
1997-03-28 Perforation 2128.30 2129.30 17
1997-03-31 Acid Treatment 2113.00 2114.00 0
1997-03-31 Acid Treatment 2118.60 2119.60 0
1997-03-31 Acid Treatment 2123.20 2124.20 0
1997-03-31 Acid Treatment 2128.30 2129.30 0
2002-04-25 Packing Device Capped w/Cement 1970.00 2089.50 0
2002-05-12 Packing Device Capped w/Cement 1415.70 1958.00 0
2002-05-14 Perforation 273.00 273.50 26
2002-05-14 Remedial Casing Cementing 273.00 273.50 0
1972-12-15 Acid Treatment 2150.10 2156.20 0
1980-10-20 Acid Treatment 2150.10 2156.20 0
1986-07-15 Cement Squeeze 2150.10 2156.20 0
1986-07-21 Perforation 2154.90 2155.40 13
1986-07-22 Acid Treatment 2154.90 2155.40 0
1988-01-29 Perforation 2153.90 2154.90 14
1988-02-01 Acid Treatment 2153.90 2154.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 2836 0.0 0.0 0.0
1971 1442 0.0 0.0 0.0
1972 2204 0.0 0.0 0.0
1973 7540 0.0 0.0 0.0
1974 6943 0.0 0.0 0.0
1975 5025 0.0 0.0 0.0
1976 6114 0.0 0.0 0.0
1977 5504 0.0 0.0 0.0
1978 5214 0.0 0.0 0.0
1979 8667 0.0 0.0 0.0
1980 7654 0.0 0.0 0.0
1981 7634 0.0 0.0 0.0
1982 6957 0.0 0.0 0.0
1983 4791 0.0 0.0 0.0
1984 4583 0.0 0.0 0.0
1985 5142 0.0 0.0 0.0
1986 4948 0.0 0.0 0.0
1987 7193 0.0 0.0 0.0
1988 6928 0.0 0.0 0.0
1989 7491 0.0 0.0 0.0
1990 8128 0.0 0.0 0.0
1991 7846 0.0 0.0 0.0
1992 7812 0.0 0.0 0.0
1993 4011 0.0 0.0 0.0
1994 757 0.0 0.0 0.0
1995 4432 0.0 0.0 0.0
1996 8155 0.0 0.0 0.0
1997 2694 0.0 0.0 0.0
1998 47 0.0 0.0 0.0

For data sources see[5]

References