X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464282415002

Well Details

Well ID: 0464282415002
Loading map...
Location: 00/15-24-046-28W4/2
Location Alias: 00/15-24-46-28 W4M
Location Alias 2: 00/15-24-046-28 W4/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 24
County/Municipality: Pigeon Lake 138A
Well Name: PAN AM ET AL IR2 BGLEN 15-24MU-46-28
Operator Name: BP Canada Energy Group ULC
License Number: 0006005
License Date: 1953-01-29
License Status: RecExempt
Spud Date: 1953-02-18
Final Drill Date: 1953-04-24
Well Total Depth: 2243.60 m
Surface Hole Latitude: 52.986961
Surface Hole Longitude: -113.931761

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-01-29 Obtained License
1953-03-05 Drill Stem Test Performed
1953-03-15 Drill Stem Test Performed
1953-03-29 Drill Stem Test Performed
1953-03-30 Drill Stem Test Performed
1953-04-04 Drill Stem Test Performed
1953-04-05 Drill Stem Test Performed
1953-04-07 Liner Casing Operation Performed
1953-04-12 Drill Stem Test Performed
1953-04-16 Drill Stem Test Performed
1953-04-23 Drill Stem Test Performed
1953-04-24 Finished Drilling
1953-04-24 Well Mode changed to Drilled and Cased
1953-04-27 Perforation Treatment Performed - Jet Perforation
1953-05-01 Perforation Treatment Performed - Cement Squeeze
1953-05-03 Perforation Treatment Performed - Cement Squeeze
1953-05-05 Drill Stem Test Performed
1953-05-06 Perforation Treatment Performed - Jet Perforation
1963-09-07 Perforation Treatment Performed - Open-Hole Completion
1963-10-14 Well Began Injection
1963-10-14 Well Fluid changed to Water
1963-10-14 Well Type changed to Disposal
1975-08-20 Perforation Treatment Performed - Jet Perforation
1975-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-21 Perforation Treatment Performed - Acid Wash - No Pressure
1975-08-22 Well Fluid changed to Water
1975-08-22 Well Mode changed to Suspended
1975-08-22 Well Type changed to Disposal
1978-03-21 Well Log Performed
1986-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-03 Perforation Treatment Performed - Jet Perforation
1988-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-19 Plug Back Performed
1994-06-19 Well Fluid changed to Water
1994-06-19 Well Mode changed to Abandoned
1994-06-19 Well Type changed to Disposal
1994-06-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-04-27 Perforation 2133.60 2139.70 13
1988-03-03 Perforation 2150.00 2150.50 13
1988-03-09 Acid Treatment 2150.00 2150.50 0
1994-06-19 Packing Device Capped w/Cement 2109.00 2117.00 0
1953-05-01 Cement Squeeze 2133.60 2139.70 0
1953-05-03 Cement Squeeze 2133.60 2139.70 0
1953-05-06 Perforation 2125.40 2131.50 13
1963-09-07 Open Hole/Barefoot Completion 2182.70 2243.60 0
1975-08-20 Perforation 2140.60 2143.70 7
1975-08-21 Acid Wash 2140.60 2143.70 0
1975-08-21 Acid Treatment 2140.60 2143.70 0
1986-07-08 Acid Treatment 2140.60 2143.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0

For data sources see[5]

References