X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464280306002

Well Details

Well ID: 0464280306002
Loading map...
Location: 00/06-03-046-28W4/2
Location Alias: 00/06-03-46-28 W4M
Location Alias 2: 00/06-03-046-28 W4/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 03
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 6-3-46-28
Operator Name: Cenovus Energy Inc.
License Number: 0005395
License Date: 1952-09-30
License Status: Issued
Spud Date: 1952-11-19
Final Drill Date: 1953-02-22
Well Total Depth: 2246.00 m
Surface Hole Latitude: 52.936178
Surface Hole Longitude: -113.985278

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-30 Obtained License
1952-11-19 Lost Circulation Occurred
1952-12-02 Drill Stem Test Performed
1952-12-07 Drill Stem Test Performed
1952-12-14 Drill Stem Test Performed
1953-01-28 Drill Stem Test Performed
1953-01-31 Liner Casing Operation Performed
1953-02-03 Perforation Treatment Performed - Jet Perforation
1953-02-22 Finished Drilling
1953-02-22 Perforation Treatment Performed - Open-Hole Completion
1953-02-22 Well Mode changed to Drilled and Cased
1955-08-01 Well Began Injection
1955-08-01 Well Fluid changed to Gas
1955-08-01 Well Type changed to Injection
1969-08-18 Well Fluid changed to Gas
1969-08-18 Well Mode changed to Suspended
1969-08-18 Well Type changed to Injection
1972-01-20 Well Began Production
1972-01-20 Well Fluid changed to Gas
1972-01-20 Well Mode changed to Flowing
1972-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-31 Well Fluid changed to Gas
1975-01-31 Well Mode changed to Suspended
1975-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-25 Perforation Treatment Performed - Cement Squeeze
1981-09-05 Perforation Treatment Performed - Cement Squeeze
1981-09-05 Well Fluid changed to Gas
1981-09-05 Well Mode changed to Abandoned Zone
1981-09-27 Perforation Treatment Performed - Jet Perforation
1981-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-13 Well Log Performed
1985-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-20 Perforation Treatment Performed - Cement Squeeze
1985-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-23 Perforation Treatment Performed - Jet Perforation
1985-11-26 Perforation Treatment Performed - Remedial Casing
1985-11-27 Perforation Treatment Performed - Jet Perforation
1985-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-12-13 Well Log Performed
1990-01-08 Perforation Treatment Performed - Cement Squeeze
1990-01-12 Perforation Treatment Performed - Jet Perforation
1990-01-12 Well Log Performed
1990-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-20 Well Log Performed
1991-03-22 Well Log Performed
1991-03-23 Perforation Treatment Performed - Cement Squeeze
1991-03-25 Perforation Treatment Performed - Jet Perforation
1991-03-25 Well Log Performed
1991-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-27 Well Log Performed
1994-09-08 Well Log Performed
1994-09-14 Well Log Performed
1994-09-20 Well Log Performed
1996-07-30 Well Log Performed
1996-08-01 Perforation Treatment Performed - Cement Squeeze
1996-08-02 Well Log Performed
1996-08-03 Perforation Treatment Performed - Jet Perforation
1996-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-02 Perforation Treatment Performed - Jet Perforation
1997-10-02 Well Log Performed
1997-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-09 Perforation Treatment Performed - Jet Perforation
1998-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-25 Well Log Performed
1998-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-27 Perforation Treatment Performed - Jet Perforation
1999-05-11 Perforation Treatment Performed - Jet Perforation
1999-05-11 Well Log Performed
1999-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-13 Well Log Performed
2000-12-03 Well Log Performed
2001-05-08 Perforation Treatment Performed - Jet Perforation
2001-05-08 Well Log Performed
2001-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-02-03 Perforation 2078.10 2085.70 13
1985-11-20 Cement Squeeze 2210.00 2212.00 0
1985-11-23 Perforation 2219.40 2220.40 13
1985-11-23 Acid Treatment 2219.40 2220.40 0
1985-11-26 Remedial Casing Cementing 2219.40 2220.40 0
1985-11-27 Perforation 2215.90 2217.40 13
1985-11-28 Acid Treatment 2215.90 2217.40 0
1990-01-08 Cement Squeeze 2215.90 2217.40 0
1990-01-12 Perforation 2217.50 2219.00 20
1990-01-15 Acid Treatment 2217.50 2219.00 0
1991-03-23 Cement Squeeze 2217.50 2219.00 0
1953-02-22 Open Hole/Barefoot Completion 2194.60 2215.30 0
1991-03-25 Perforation 2221.00 2222.00 13
1991-03-26 Acid Treatment 2221.00 2222.00 0
1996-08-01 Cement Squeeze 2221.00 2222.00 0
1996-08-03 Perforation 2218.50 2220.50 20
1996-08-04 Acid Treatment 2218.50 2220.50 0
1997-10-02 Perforation 2207.50 2209.00 20
1997-10-03 Acid Treatment 2207.50 2209.00 0
1998-01-09 Perforation 2198.50 2200.00 17
1998-01-12 Acid Treatment 2198.50 2200.00 0
1998-11-27 Perforation 2186.00 2187.50 17
1972-07-26 Acid Treatment 2078.10 2215.30 0
1998-11-27 Acid Treatment 2186.00 2187.50 0
1999-05-11 Perforation 2164.50 2184.00 17
1999-05-12 Acid Treatment 2164.50 2184.00 0
2001-05-08 Perforation 2119.00 2122.00 17
2001-05-08 Perforation 2099.00 2102.00 17
2001-05-09 Acid Treatment 2119.00 2122.00 0
2001-05-09 Acid Treatment 2099.00 2102.00 0
1975-02-07 Acid Treatment 2194.60 2215.30 0
1981-08-25 Cement Squeeze 2078.10 2085.70 0
1981-09-05 Cement Squeeze 2194.60 2215.30 0
1981-09-27 Perforation 2210.00 2212.00 13
1981-10-20 Acid Treatment 2210.00 2212.00 0
1985-11-17 Acid Treatment 2210.00 2212.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1974 6323 0.0 0.0 0.0
1975 451 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1952-11-19 Lost Circulation 21.30 21.30

For data sources see[6]

References