X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464202902002

Well Details

Well ID: 0464202902002
Loading map...
Location: 00/02-29-046-20W4/2
Location Alias: 00/02-29-46-20 W4M
Location Alias 2: 00/02-29-046-20 W4/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 20
Section: 29
County/Municipality: Camrose
Well Name: PCI BP JOARCAM 2-29-46-20
Operator Name: Suncor Energy Inc.
License Number: 0006772
License Date: 1953-07-20
License Status: RecCertified
Spud Date: 1953-08-12
Final Drill Date: 1953-09-07
Well Total Depth: 1338.10 m
Surface Hole Latitude: 52.990748
Surface Hole Longitude: -112.867419

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-20 Obtained License
1953-08-20 Drill Stem Test Performed
1953-08-21 Drill Stem Test Performed
1953-08-23 Drill Stem Test Performed
1953-08-24 Drill Stem Test Performed
1953-08-25 Drill Stem Test Performed
1953-08-26 Drill Stem Test Performed
1953-08-29 Drill Stem Test Performed
1953-08-30 Drill Stem Test Performed
1953-09-01 Drill Stem Test Performed
1953-09-02 Drill Stem Test Performed
1953-09-05 Drill Stem Test Performed
1953-09-07 Finished Drilling
1953-09-07 Well Mode changed to Drilled and Cased
1953-09-08 Drill Stem Test Performed
1953-09-09 Production Casing Operation Performed
1953-09-12 Drill Stem Test Performed
1953-09-12 Perforation Treatment Performed - Bullet Perforation
1953-09-13 Perforation Treatment Performed - Bullet Perforation
1953-11-19 Perforation Treatment Performed - Acid Wash - No Pressure
1953-11-25 Perforation Treatment Performed - Bullet Perforation
1974-08-07 Perforation Treatment Performed - Jet Perforation
1980-11-15 Perforation Treatment Performed - Abrasa-Jet Perforation
1980-11-16 Well Began Production
1980-11-16 Well Fluid changed to Gas
1980-11-16 Well Mode changed to Flowing
1980-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-18 Well Fluid changed to Gas
1981-06-18 Well Mode changed to Suspended
1981-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-04 Perforation Treatment Performed - Cement Plug
1985-07-04 Plug Back Performed
1985-07-05 Perforation Treatment Performed - Cement Plug
1985-07-05 Plug Back Performed
1985-07-05 Well Fluid changed to Gas
1985-07-05 Well Mode changed to Abandoned
1985-07-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-09-12 Bullet Perforation 1190.20 1192.70 13
1980-11-25 Acid Treatment 997.00 998.50 0
1981-11-21 Acid Treatment 1190.20 1196.90 0
1985-07-04 Cement Plug 1066.00 1196.70 0
1985-07-05 Cement Plug 964.00 1066.00 0
1953-09-12 Bullet Perforation 1194.20 1195.70 13
1953-09-13 Bullet Perforation 1194.50 1196.90 13
1953-11-19 Acid Wash 1190.20 1196.90 0
1953-11-25 Bullet Perforation 1165.60 1167.40 13
1953-11-25 Bullet Perforation 1162.80 1164.30 13
1974-08-07 Perforation 1158.50 1160.40 7
1980-11-15 Hydra Jet Perforation 997.00 998.00 0
1980-11-15 Hydra Jet Perforation 998.50 998.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 362 0.0 0.0 0.0
1981 72 0.0 0.0 0.0

For data sources see[5]

References