X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464162809003

Well Details

Well ID: 0464162809003
Loading map...
Location: 00/09-28-046-16W4/3
Location Alias: 00/09-28-46-16 W4M
Location Alias 2: 00/09-28-046-16 W4/03
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 16
Section: 28
County/Municipality: Flagstaff County
Well Name: PEOC BRUCE 9-28-46-16
Operator Name: Sequoia Resources Corp.
License Number: 0258251
License Date: 2001-08-03
License Status: Suspension
Spud Date: 2001-09-11
Final Drill Date: 2001-09-14
Well Total Depth: 1022.00 m
Surface Hole Latitude: 52.998216
Surface Hole Longitude: -112.257824

For data sources see[1][2]

Well History

Date Event
2001-08-03 Obtained License
2001-09-12 Surface Casing Operation Performed
2001-09-14 Finished Drilling
2001-09-14 Production Casing Operation Performed
2001-09-14 Well Log Performed
2001-09-14 Well Mode changed to Drilled and Cased
2001-09-15 Rig Released
2001-09-25 Perforation Treatment Performed - Jet Perforation
2001-09-26 Perforation Treatment Performed - Jet Perforation
2001-09-26 Well Log Performed
2001-09-26 Well Mode changed to Drilled and Cased
2001-11-07 Well Began Production
2001-11-07 Well Fluid changed to Gas
2001-11-07 Well Mode changed to Flowing
2002-08-23 Perforation Treatment Performed - Chemical Squeeze
2002-09-26 Perforation Treatment Performed - Chemical Squeeze
2003-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-19 Plug Back Performed
2003-10-15 Well Log Performed
2009-07-01 Well Fluid changed to Gas
2009-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-09-25 Perforation 978.00 979.00 20
2001-09-26 Perforation 976.00 977.00 20
2001-09-26 Perforation 961.00 962.00 20
2001-09-26 Perforation 948.00 951.00 20
2002-08-23 Chemical Squeeze 976.00 979.00 0
2002-09-26 Chemical Squeeze 976.00 979.00 0
2003-03-19 Packing Device Capped w/Cement 966.00 974.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1303 0.0 0.0 0.0
2002 8512 0.0 0.0 0.0
2003 4405 0.0 0.0 0.0
2004 7520 0.0 0.0 0.0
2005 8568 0.0 0.0 0.0
2006 8436 0.0 0.0 0.0
2007 8543 0.0 0.0 0.0
2008 2481 0.0 0.0 0.0

For data sources see[5]

References