X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464130211002

Well Details

Well ID: 0464130211002
Loading map...
Location: 00/11-02-046-13W4/2
Location Alias: 00/11-02-46-13 W4M
Location Alias 2: 00/11-02-046-13 W4/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 13
Section: 02
County/Municipality: Beaver County
Well Name: VOYAGER ET AL KILLAMN 11-2-46-13
Operator Name: ConocoPhillips Canada Operations ULC
License Number: 0055027
License Date: 1975-09-19
License Status: RecCertified
Spud Date: 1975-09-21
Final Drill Date: 1975-09-24
Well Total Depth: 910.10 m
Surface Hole Latitude: 52.938274
Surface Hole Longitude: -111.787492

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-19 Obtained License
1975-09-23 Drill Stem Test Performed
1975-09-24 Finished Drilling
1975-09-24 Well Mode changed to Drilled and Cased
1975-09-25 Drill Stem Test Performed
1975-09-26 Production Casing Operation Performed
1975-10-13 Perforation Treatment Performed - Jet Perforation
1975-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-16 Perforation Treatment Performed - Acid Wash - No Pressure
1975-10-16 Perforation Treatment Performed - Jet Perforation
1976-10-01 Well Began Production
1976-10-01 Well Fluid changed to Gas
1976-10-01 Well Mode changed to Flowing
1976-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-10-09 Perforation Treatment Performed - Jet Perforation
1977-02-24 Perforation Treatment Performed - Jet Perforation
1977-02-24 Well Fluid changed to Gas
1977-02-24 Well Mode changed to Flowing
1977-03-03 Perforation Treatment Performed - Fractured
1980-06-01 Well Fluid changed to Gas
1980-06-01 Well Mode changed to Suspended
1981-08-01 Well Fluid changed to Gas
1981-08-01 Well Mode changed to Flowing
1982-05-01 Well Fluid changed to Gas
1982-05-01 Well Mode changed to Suspended
1982-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-12-10 Well Fluid changed to Gas
1982-12-10 Well Mode changed to Suspended
1983-01-01 Well Fluid changed to Gas
1983-01-01 Well Mode changed to Flowing
1983-05-01 Well Fluid changed to Gas
1983-05-01 Well Mode changed to Suspended
1984-01-01 Well Fluid changed to Gas
1984-01-01 Well Mode changed to Flowing
1992-01-23 Perforation Treatment Performed - Jet Perforation
1992-01-24 Perforation Treatment Performed - Jet Perforation
1992-01-24 Well Fluid changed to Gas
1992-01-24 Well Log Performed
1992-01-24 Well Mode changed to Flowing
1993-06-01 Well Fluid changed to Gas
1993-06-01 Well Mode changed to Suspended
1994-03-21 Well Log Performed
1994-03-25 Well Log Performed
1994-04-17 Perforation Treatment Performed - Cement Squeeze
1994-04-17 Plug Back Performed
1994-04-18 Perforation Treatment Performed - Jet Perforation
1994-04-19 Perforation Treatment Performed - Cement Squeeze
1994-04-19 Plug Back Performed
1994-04-25 Perforation Treatment Performed - Jet Perforation
1994-04-26 Well Fluid changed to Gas
1994-04-26 Well Mode changed to Suspended
1999-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-08 Plug Back Performed
1999-10-08 Well Fluid changed to Gas
1999-10-08 Well Mode changed to Abandoned Zone
1999-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-12 Plug Back Performed
1999-12-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-13 Perforation 849.80 852.20 7
1982-12-10 Packing Device Capped w/Cement 751.00 759.00 0
1992-01-23 Perforation 119.00 122.00 13
1992-01-24 Perforation 108.00 110.00 13
1994-04-17 Cement Squeeze 108.00 110.00 0
1994-04-17 Cement Squeeze 119.00 122.00 0
1994-04-17 Cement Squeeze 245.40 246.90 0
1994-04-18 Perforation 108.00 110.00 13
1994-04-18 Perforation 119.00 122.00 13
1994-04-18 Perforation 245.40 246.90 13
1994-04-19 Cement Squeeze 108.00 110.00 0
1975-10-16 Perforation 862.30 863.80 7
1994-04-19 Cement Squeeze 119.00 122.00 0
1994-04-19 Cement Squeeze 245.40 246.90 0
1994-04-25 Perforation 720.80 722.30 13
1999-10-08 Packing Device Capped w/Cement 703.00 711.00 0
1999-10-12 Packing Device Capped w/Cement 96.70 104.70 0
1975-10-16 Acid Wash 849.80 863.80 0
1975-10-16 Acid Treatment 849.80 863.80 0
1976-10-09 Packing Device Capped w/Cement 841.20 841.20 0
1976-10-09 Perforation 245.40 246.90 13
1977-02-24 Perforation 766.90 768.40 13
1977-02-24 Perforation 770.80 772.10 13
1977-03-03 Fracture 766.90 772.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 1768 0.0 0.0 0.0
1978 4357 0.0 0.0 0.0
1979 5515 0.0 0.0 0.0
1980 2916 0.0 0.0 0.0
1981 909 0.0 0.0 0.0
1982 2420 0.0 0.0 0.0
1983 616 0.0 0.0 0.0
1984 3291 0.0 0.0 0.0
1985 1420 0.0 0.0 0.0
1986 4652 0.0 0.0 0.0
1987 2379 0.0 0.0 0.0
1988 2755 0.0 0.0 0.0
1989 1605 0.0 0.0 0.0
1990 1670 0.0 0.0 0.0
1991 4193 0.0 0.0 0.0
1992 421 0.0 0.0 0.0

For data sources see[5]

References