X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464111606004

Well Details

Well ID: 0464111606004
Loading map...
Location: 00/06-16-046-11W4/4
Location Alias: 00/06-16-46-11 W4M
Location Alias 2: 00/06-16-046-11 W4/04
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 11
Section: 16
County/Municipality: Beaver County
Well Name: LONG RUN VIK-KINS 6-16-46-11
Operator Name: Long Run Exploration Ltd.
License Number: 0066696
License Date: 1977-11-14
License Status: Issued
Spud Date: 1977-11-27
Final Drill Date: 1977-11-30
Well Total Depth: 808.00 m
Surface Hole Latitude: 52.964906
Surface Hole Longitude: -111.543252

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-14 Obtained License
1977-11-30 Drill Stem Test Performed
1977-11-30 Finished Drilling
1977-11-30 Well Mode changed to Drilled and Cased
1977-12-01 Drill Stem Test Performed
1977-12-02 Drill Stem Test Performed
1977-12-05 Production Casing Operation Performed
1978-01-22 Perforation Treatment Performed - Jet Perforation
1980-01-14 Perforation Treatment Performed - Jet Perforation
1980-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-15 Perforation Treatment Performed - Cement Squeeze
1980-01-17 Perforation Treatment Performed - Jet Perforation
1980-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-03 Perforation Treatment Performed - Jet Perforation
1982-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-01-26 Plug Back Performed
1982-01-27 Perforation Treatment Performed - Jet Perforation
2001-09-06 Perforation Treatment Performed - Jet Perforation
2001-09-06 Well Log Performed
2001-09-06 Well Mode changed to Drilled and Cased
2001-09-09 Perforation Treatment Performed - Jet Perforation
2001-09-10 Perforation Treatment Performed - Remedial Casing
2001-09-22 Well Began Production
2001-09-22 Well Fluid changed to Gas
2001-09-22 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-22 Perforation 781.20 783.00 7
1982-01-27 Perforation 689.50 690.70 7
2001-09-06 Perforation 726.30 729.30 17
2001-09-06 Perforation 723.20 726.30 17
2001-09-06 Perforation 689.50 690.40 17
2001-09-09 Perforation 281.00 282.00 12
2001-09-10 Remedial Casing Cementing 281.00 282.00 0
1980-01-14 Perforation 787.00 788.20 13
1980-01-15 Acid Treatment 781.20 788.20 0
1980-01-15 Cement Squeeze 781.20 788.20 0
1980-01-17 Perforation 781.20 783.00 13
1980-03-02 Packing Device Capped w/Cement 769.00 777.00 0
1980-03-03 Perforation 755.30 756.20 6
1982-01-26 Packing Device Capped w/Cement 742.00 750.00 0
1982-01-27 Perforation 689.50 690.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2440 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8758 0.0 0.0 0.0
2004 8759 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8758 0.0 0.0 0.0
2007 8687 0.0 0.0 0.0
2008 8511 0.0 0.0 0.0
2009 8719 0.0 0.0 0.0
2010 8753 0.0 0.0 0.0
2011 8751 0.0 0.0 0.0
2012 8741 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 8589 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References