If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464102613030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.00096,"lon":-111.353921,"icon":""}]} |
Location: 03/13-26-046-10W4/0 | |
Location Alias: 03/13-26-46-10 W4M | |
Location Alias 2: 03/13-26-046-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 10 | |
Section: 26 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: PINE CLIFF VIK-KINS 13-26-46-10 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0446970 | |
License Date: 2012-06-29 | |
License Status: Issued | |
Spud Date: 2012-09-07 | |
Final Drill Date: 2012-09-09 | |
Well Total Depth: 756.00 m | |
Surface Hole Latitude: 53.000960 | |
Surface Hole Longitude: -111.353921 |
Date | Event |
---|---|
2012-06-29 | Obtained License |
2012-09-08 | Surface Casing Operation Performed |
2012-09-09 | Finished Drilling |
2012-09-09 | Well Mode changed to Drilled and Cased |
2012-09-10 | Production Casing Operation Performed |
2012-09-10 | Rig Released |
2012-10-05 | Well Log Performed |
2012-10-08 | Perforation Treatment Performed - Jet Perforation |
2012-10-13 | Perforation Treatment Performed - Fractured |
2012-11-29 | Well Began Production |
2012-11-29 | Well Fluid changed to Crude Oil |
2012-11-29 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-07 | Precision Drilling Corporation | 184 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-08 | Perforation | 727.00 | 729.00 | 20 |
2012-10-13 | Fracture | 727.00 | 729.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 789 | 0.0 | 0.0 | 0.0 |
2013 | 8596 | 0.0 | 0.0 | 0.0 |
2014 | 8532 | 0.0 | 0.0 | 0.0 |
2015 | 8153 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8746 | 0.0 | 0.0 | 0.0 |
2018 | 8668 | 0.0 | 0.0 | 0.0 |
2019 | 8050 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-10 | No Incident Encountered | 0.00 | 0.00 |
2012-10-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]