X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464092110000

Well Details

Well ID: 0464092110000
Loading map...
Location: 00/10-21-046-09W4/0
Location Alias: 00/10-21-46-09 W4M
Location Alias 2: 00/10-21-046-09 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 09
Section: 21
County/Municipality: Municipal District of Wainwright No. 61
Well Name: RANGER WESTATES VIKING 10-21-46-9
Operator Name: Canadian Natural Resources Limited
License Number: 0010558
License Date: 1955-11-29
License Status: Abandoned
Spud Date: 1955-11-29
Final Drill Date: 1955-12-07
Well Total Depth: 771.10 m
Surface Hole Latitude: 52.982861
Surface Hole Longitude: -111.245858

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-11-29 Obtained License
1955-12-05 Drill Stem Test Performed
1955-12-07 Drill Stem Test Performed
1955-12-07 Finished Drilling
1955-12-08 Production Casing Operation Performed
1955-12-10 Perforation Treatment Performed - Jet Perforation
1955-12-12 Well Mode changed to Drilled and Cased
1956-12-21 Well Began Production
1956-12-21 Well Fluid changed to Gas
1956-12-21 Well Mode changed to Flowing
1962-10-09 Perforation Treatment Performed - Acid Wash - No Pressure
1962-10-09 Perforation Treatment Performed - Bullet Perforation
1962-10-09 Well Fluid changed to Gas
1962-10-09 Well Mode changed to Flowing
1963-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1963-08-04 Well Fluid changed to Gas
1963-08-04 Well Mode changed to Flowing
1963-08-05 Perforation Treatment Performed - Jet Perforation
1963-08-06 Perforation Treatment Performed - Acid Wash - No Pressure
1963-08-07 Perforation Treatment Performed - Jet Perforation
1978-03-23 Perforation Treatment Performed - Jet Perforation
1978-03-24 Perforation Treatment Performed - Acid Wash - No Pressure
1978-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-03-25 Perforation Treatment Performed - Cement Squeeze
1978-03-26 Perforation Treatment Performed - Jet Perforation
1978-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-02 Perforation Treatment Performed - Cement Squeeze
1978-04-02 Perforation Treatment Performed - Jet Perforation
1978-04-03 Perforation Treatment Performed - Jet Perforation
1978-04-11 Well Fluid changed to Gas
1978-04-11 Well Mode changed to Flowing
1985-08-08 Well Fluid changed to Gas
1985-08-08 Well Mode changed to Suspended
1985-09-01 Well Fluid changed to Gas
1985-09-01 Well Mode changed to Flowing
1988-10-01 Well Fluid changed to Gas
1988-10-01 Well Mode changed to Suspended
1989-02-17 Perforation Treatment Performed - Cement Squeeze
1989-02-17 Plug Back Performed
1999-10-19 Perforation Treatment Performed - Cement Plug
1999-10-19 Perforation Treatment Performed - Jet Perforation
1999-10-19 Plug Back Performed
1999-10-19 Well Fluid changed to Gas
1999-10-19 Well Mode changed to Abandoned Zone
1999-10-20 Perforation Treatment Performed - Remedial Casing
1999-10-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-12-10 Perforation 717.50 719.30 13
1978-03-25 Cement Squeeze 735.80 745.20 0
1978-03-25 Packing Device Capped w/Cement 742.80 742.80 0
1978-03-26 Perforation 733.70 734.60 7
1978-03-26 Perforation 718.10 719.90 7
1978-04-01 Acid Treatment 718.10 734.60 0
1978-04-02 Perforation 687.60 688.80 7
1978-04-02 Cement Squeeze 733.70 734.60 0
1978-04-03 Perforation 718.10 719.90 7
1989-02-17 Cement Squeeze 687.60 688.80 0
1999-10-19 Cement Plug 719.70 724.70 0
1962-10-09 Bullet Perforation 759.00 759.90 13
1999-10-19 Cement Plug 711.70 719.70 0
1999-10-19 Perforation 218.00 219.00 13
1999-10-20 Remedial Casing Cementing 218.00 219.00 0
1962-10-09 Acid Wash 759.00 759.90 0
1963-08-04 Packing Device Capped w/Cement 755.90 755.90 0
1963-08-05 Perforation 733.70 735.80 13
1963-08-06 Acid Wash 733.70 735.80 0
1963-08-07 Perforation 735.80 737.60 13
1978-03-23 Perforation 744.30 745.20 7
1978-03-24 Acid Wash 735.80 745.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 408 0.0 0.0 0.0
1969 2378 0.0 0.0 0.0
1970 4332 0.0 0.0 0.0
1971 5296 0.0 0.0 0.0
1972 8249 0.0 0.0 0.0
1973 8482 0.0 0.0 0.0
1974 8472 0.0 0.0 0.0
1975 7504 0.0 0.0 0.0
1976 6742 0.0 0.0 0.0
1977 6719 0.0 0.0 0.0
1978 5226 0.0 0.0 0.0
1979 6105 0.0 0.0 0.0
1980 6147 0.0 0.0 0.0
1981 6770 0.0 0.0 0.0
1982 6493 0.0 0.0 0.0
1983 5958 0.0 0.0 0.0
1984 5928 0.0 0.0 0.0
1985 5970 0.0 0.0 0.0
1986 5853 0.0 0.0 0.0
1987 6278 0.0 0.0 0.0
1988 3987 0.0 0.0 0.0

For data sources see[5]

References