X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464060410D00

Well Details

Well ID: 0464060410D00
Loading map...
Location: D0/10-04-046-06W4/0
Location Alias: D0/10-04-46-06 W4M
Location Alias 2: D0/10-04-046-06 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 06
Section: 04
County/Municipality: Municipal District of Wainwright No. 61
Well Name: COLUMBUS WAINWR 10-4-46-6
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0056359
License Date: 1975-12-29
License Status: Suspension
Spud Date: 1976-01-19
Final Drill Date: 1976-01-21
Well Total Depth: 654.10 m
Surface Hole Latitude: 52.940452
Surface Hole Longitude: -110.810122

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-12-29 Obtained License
1976-01-21 Finished Drilling
1976-01-22 Drill Stem Test Performed
1976-01-23 Production Casing Operation Performed
1976-07-23 Well Mode changed to Drilled and Cased
1977-11-20 Perforation Treatment Performed - Jet Perforation
1977-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-23 Perforation Treatment Performed - Fractured
1987-11-06 Well Began Production
1987-11-06 Well Fluid changed to Crude Oil
1987-11-06 Well Mode changed to Pumping
1988-07-08 Perforation Treatment Performed - Cement Squeeze
1988-07-08 Well Log Performed
1988-07-10 Perforation Treatment Performed - Jet Perforation
1988-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-01 Well Fluid changed to Crude Oil
1988-10-01 Well Mode changed to Suspended
2005-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-15 Plug Back Performed
2005-11-15 Well Fluid changed to Crude Oil
2005-11-15 Well Mode changed to Abandoned Zone
2005-11-16 Perforation Treatment Performed - Jet Perforation
2005-11-28 Perforation Treatment Performed - Bridge Plug No Cement Required
2005-11-28 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-20 Perforation 631.50 632.50 7
2005-11-28 Perforation 540.00 555.00 17
1977-11-21 Acid Treatment 631.50 632.50 0
1977-11-23 Fracture 631.50 632.50 0
1988-07-08 Cement Squeeze 631.50 632.50 0
1988-07-10 Perforation 635.50 638.90 13
1988-07-11 Acid Treatment 635.50 638.90 0
2005-11-15 Packing Device Capped w/Cement 612.00 620.00 0
2005-11-16 Perforation 589.00 591.20 17
2005-11-28 Bridge Plug, No Cement 585.00 585.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 611 0.0 0.0 0.0
1988 1491 0.0 0.0 0.0

For data sources see[5]

References