If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464051209000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.955272,"lon":-110.585605,"icon":""}]} |
Location: 00/09-12-046-05W4/0 | |
Location Alias: 00/09-12-46-05 W4M | |
Location Alias 2: 00/09-12-046-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 05 | |
Section: 12 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: PRED WAINWR 9-12-46-5 | |
Operator Name: Surge Energy Inc. | |
License Number: 0115187 | |
License Date: 1985-06-07 | |
License Status: Abandoned | |
Spud Date: 1985-06-18 | |
Final Drill Date: 1985-08-01 | |
Well Total Depth: 772.00 m | |
Surface Hole Latitude: 52.955272 | |
Surface Hole Longitude: -110.585605 |
Date | Event |
---|---|
1985-06-07 | Obtained License |
1985-06-19 | Surface Casing Operation Performed |
1985-06-22 | Well Log Performed |
1985-06-23 | Production Casing Operation Performed |
1985-07-31 | Well Log Performed |
1985-08-01 | Finished Drilling |
1985-08-01 | Perforation Treatment Performed - Open-Hole Completion |
1985-08-01 | Well Log Performed |
1985-08-02 | Liner Casing Operation Performed |
1985-08-02 | Perforation Treatment Performed - Cement Squeeze |
1985-08-02 | Rig Released |
1985-09-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-09-15 | Perforation Treatment Performed - Jet Perforation |
1985-09-16 | Perforation Treatment Performed - Jet Perforation |
1985-09-16 | Well Mode changed to Drilled and Cased |
1985-10-02 | Perforation Treatment Performed - Fractured |
1985-10-31 | Perforation Treatment Performed - Jet Perforation |
1985-11-01 | Perforation Treatment Performed - Jet Perforation |
1985-11-02 | Perforation Treatment Performed - Jet Perforation |
1985-11-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-09-17 | Well Began Production |
1986-09-17 | Well Fluid changed to Crude Oil |
1986-09-17 | Well Mode changed to Flowing |
1988-05-30 | Well Fluid changed to Crude Oil |
1988-05-30 | Well Mode changed to Suspended |
1989-08-01 | Well Fluid changed to Crude Oil |
1989-08-01 | Well Mode changed to Flowing |
1991-10-01 | Well Fluid changed to Crude Oil |
1991-10-01 | Well Mode changed to Suspended |
1994-06-15 | Well Fluid changed to Crude Oil |
1994-06-15 | Well Mode changed to Flowing |
1994-12-29 | Well Fluid changed to Crude Oil |
1994-12-29 | Well Mode changed to Suspended |
1995-05-01 | Well Fluid changed to Crude Oil |
1995-05-01 | Well Mode changed to Flowing |
1995-09-29 | Well Fluid changed to Crude Oil |
1995-09-29 | Well Mode changed to Suspended |
1996-11-01 | Well Fluid changed to Crude Oil |
1996-11-01 | Well Mode changed to Flowing |
1997-09-30 | Well Fluid changed to Crude Oil |
1997-09-30 | Well Mode changed to Suspended |
2004-10-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-10-03 | Perforation Treatment Performed - Cement Plug |
2004-10-03 | Plug Back Performed |
2004-10-03 | Well Fluid changed to Crude Oil |
2004-10-03 | Well Mode changed to Abandoned Zone |
2004-10-05 | Perforation Treatment Performed - Chemical Squeeze |
2004-10-05 | Perforation Treatment Performed - Jet Perforation |
2004-10-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-10-06 | Perforation Treatment Performed - Jet Perforation |
2004-10-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-10-13 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-08-01 | Open Hole/Barefoot Completion | 722.00 | 772.00 | 0 |
1985-11-02 | Perforation | 697.50 | 698.50 | 13 |
1985-11-02 | Perforation | 699.00 | 700.00 | 13 |
1985-11-11 | Acid Treatment | 680.00 | 706.60 | 0 |
2004-10-03 | Packing Device Capped w/Cement | 701.50 | 709.50 | 0 |
2004-10-03 | Cement Plug | 653.70 | 701.50 | 0 |
2004-10-05 | Perforation | 280.00 | 281.00 | 17 |
2004-10-05 | Chemical Squeeze | 280.00 | 281.00 | 0 |
2004-10-06 | Packing Device Capped w/Cement | 235.00 | 243.00 | 0 |
2004-10-06 | Perforation | 201.00 | 202.00 | 17 |
2004-10-07 | Packing Device Capped w/Cement | 189.00 | 197.00 | 0 |
1985-08-02 | Cement Squeeze | 722.00 | 772.00 | 0 |
1985-09-15 | Perforation | 758.00 | 760.00 | 13 |
1985-09-15 | Acid Treatment | 758.00 | 760.00 | 0 |
1985-09-16 | Perforation | 680.00 | 682.00 | 13 |
1985-10-02 | Fracture | 680.00 | 682.00 | 0 |
1985-10-31 | Perforation | 704.60 | 706.60 | 13 |
1985-11-01 | Perforation | 700.00 | 703.00 | 13 |
1985-11-02 | Perforation | 695.50 | 696.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1987 | 5638 | 0.0 | 0.0 | 0.0 |
1988 | 2875 | 0.0 | 0.0 | 0.0 |
1989 | 2532 | 0.0 | 0.0 | 0.0 |
1990 | 5688 | 0.0 | 0.0 | 0.0 |
1991 | 5807 | 0.0 | 0.0 | 0.0 |
1994 | 2549 | 0.0 | 0.0 | 0.0 |
1995 | 2484 | 0.0 | 0.0 | 0.0 |
1996 | 552 | 0.0 | 0.0 | 0.0 |
1997 | 1728 | 0.0 | 0.0 | 0.0 |
For data sources see[5]