If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0455152001000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.887663,"lon":-116.133777,"icon":""}]} |
| Location: 00/01-20-045-15W5/0 | |
| Location Alias: 00/01-20-45-15 W5M | |
| Location Alias 2: 00/01-20-045-15 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 045 | |
| Meridian: 5 | |
| Range: 15 | |
| Section: 20 | |
| County/Municipality: Yellowhead County | |
| Well Name: HUSKY COLUMBIA 1-20-45-15 | |
| Operator Name: Husky Oil Operations Limited | |
| License Number: 0217098 | |
| License Date: 1998-08-20 | |
| License Status: Issued | |
| Spud Date: 1998-09-17 | |
| Final Drill Date: 1998-10-03 | |
| Well Total Depth: 2793.00 m | |
| Surface Hole Latitude: 52.887663 | |
| Surface Hole Longitude: -116.133777 |
| Date | Event |
|---|---|
| 1998-08-20 | Obtained License |
| 1998-09-20 | Surface Casing Operation Performed |
| 1998-09-30 | Lost Circulation Occurred |
| 1998-10-03 | Finished Drilling |
| 1998-10-04 | Well Log Performed |
| 1998-10-05 | Well Log Performed |
| 1998-10-06 | Drill Stem Test Performed |
| 1998-10-08 | Production Casing Operation Performed |
| 1998-10-09 | Rig Released |
| 1998-10-09 | Well Mode changed to Drilled and Cased |
| 1998-10-21 | Well Log Performed |
| 1998-10-23 | Perforation Treatment Performed - Jet Perforation |
| 1998-10-23 | Well Log Performed |
| 1998-10-24 | Perforation Treatment Performed - Fractured |
| 1998-11-04 | Well Log Performed |
| 1998-11-09 | Perforation Treatment Performed - Jet Perforation |
| 1998-11-09 | Well Log Performed |
| 1998-11-11 | Perforation Treatment Performed - Fractured |
| 1998-11-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-11-18 | Plug Back Performed |
| 1998-11-18 | Well Mode changed to Abandoned Zone |
| 1998-11-19 | Perforation Treatment Performed - Jet Perforation |
| 1998-11-19 | Well Log Performed |
| 1998-11-21 | Perforation Treatment Performed - Fractured |
| 1998-11-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-11-26 | Perforation Treatment Performed - Fractured |
| 1998-12-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-12-02 | Plug Back Performed |
| 1998-12-02 | Well Log Performed |
| 2007-06-12 | Perforation Treatment Performed - Jet Perforation |
| 2007-06-15 | Perforation Treatment Performed - Jet Perforation |
| 2008-12-01 | Well Began Production |
| 2008-12-01 | Well Fluid changed to Gas |
| 2008-12-01 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1998-10-23 | Perforation | 2675.00 | 2678.00 | 17 |
| 1998-11-25 | Acid Treatment | 1902.50 | 1911.50 | 0 |
| 1998-11-26 | Fracture | 1902.50 | 1911.50 | 0 |
| 1998-12-02 | Packing Device Capped w/Cement | 1890.00 | 1898.00 | 0 |
| 2007-06-12 | Perforation | 2064.50 | 2068.50 | 17 |
| 2007-06-12 | Perforation | 1902.50 | 1911.50 | 17 |
| 2007-06-15 | Perforation | 2675.00 | 2678.00 | 17 |
| 2007-06-15 | Perforation | 2679.00 | 2681.00 | 17 |
| 1998-10-23 | Perforation | 2679.00 | 2681.00 | 17 |
| 1998-10-24 | Fracture | 2675.00 | 2681.00 | 0 |
| 1998-11-09 | Perforation | 2064.50 | 2068.50 | 17 |
| 1998-11-11 | Fracture | 2064.50 | 2068.50 | 0 |
| 1998-11-18 | Packing Device Capped w/Cement | 2661.00 | 2669.00 | 0 |
| 1998-11-18 | Packing Device Capped w/Cement | 2052.00 | 2060.00 | 0 |
| 1998-11-19 | Perforation | 1902.50 | 1911.50 | 17 |
| 1998-11-21 | Fracture | 1902.50 | 1911.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2008 | 552 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8486 | 0.0 | 0.0 | 0.0 |
| 2011 | 8382 | 0.0 | 0.0 | 0.0 |
| 2012 | 8735 | 0.0 | 0.0 | 0.0 |
| 2013 | 8521 | 0.0 | 0.0 | 0.0 |
| 2014 | 8285 | 0.0 | 0.0 | 0.0 |
| 2015 | 7732 | 0.0 | 0.0 | 0.0 |
| 2016 | 8351 | 0.0 | 0.0 | 0.0 |
| 2017 | 8459 | 0.0 | 0.0 | 0.0 |
| 2018 | 8596 | 0.0 | 0.0 | 0.0 |
| 2019 | 8673 | 0.0 | 0.0 | 0.0 |
| 2020 | 2101 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1998-09-30 | Lost Circulation | 2420.00 | 2783.00 |
For data sources see[6]