X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455142016002

Well Details

Well ID: 0455142016002
Loading map...
Location: 00/16-20-045-14W5/2
Location Alias: 00/16-20-45-14 W5M
Location Alias 2: 00/16-20-045-14 W5/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 14
Section: 20
County/Municipality: Yellowhead County
Well Name: FAIRBORNE BRAZR 16-20-45-14
Operator Name: Tourmaline Oil Corp.
License Number: 0313506
License Date: 2004-08-17
License Status: Suspension
Spud Date: 2004-10-03
Final Drill Date: 2004-10-16
Well Total Depth: 2055.00 m
Surface Hole Latitude: 52.900810
Surface Hole Longitude: -115.988862

For data sources see[1][2]

Well History

Date Event
2004-08-17 Obtained License
2004-10-04 Surface Casing Operation Performed
2004-10-09 Well Log Performed
2004-10-12 Lost Circulation Occurred
2004-10-16 Finished Drilling
2004-10-16 Well Mode changed to Drilled and Cased
2004-10-17 Well Log Performed
2004-10-19 Production Casing Operation Performed
2004-10-20 Rig Released
2004-11-08 Well Log Performed
2004-11-09 Perforation Treatment Performed - Jet Perforation
2004-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-12 Plug Back Performed
2004-11-12 Well Log Performed
2004-11-13 Perforation Treatment Performed - Jet Perforation
2004-11-13 Well Log Performed
2004-11-15 Perforation Treatment Performed - Fractured
2004-11-19 Perforation Treatment Performed - Jet Perforation
2004-11-21 Perforation Treatment Performed - Fractured
2004-11-24 Perforation Treatment Performed - Cement Squeeze
2005-02-20 Well Began Production
2005-02-20 Well Fluid changed to Gas
2005-02-20 Well Mode changed to Flowing
2012-04-01 Well Fluid changed to Gas
2012-04-01 Well Mode changed to Pumping
2016-04-01 Well Fluid changed to Gas
2016-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-11-09 Perforation 1940.00 1943.00 17
2004-11-12 Packing Device Capped w/Cement 1927.00 1935.00 0
2004-11-13 Perforation 1822.00 1827.00 17
2004-11-15 Fracture 1822.00 1827.00 0
2004-11-19 Perforation 1781.00 1787.00 17
2004-11-21 Fracture 1781.00 1787.00 0
2004-11-24 Cement Squeeze 1781.00 1787.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 7367 0.0 0.0 0.0
2006 8643 0.0 0.0 0.0
2007 8553 0.0 0.0 0.0
2008 8665 0.0 0.0 0.0
2009 8562 0.0 0.0 0.0
2010 8458 0.0 0.0 0.0
2011 8491 0.0 0.0 0.0
2012 8439 0.0 0.0 0.0
2013 8627 0.0 0.0 0.0
2014 3711 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2004-10-12 Lost Circulation 1531.00 1539.00

For data sources see[6]

References