X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455140204003

Well Details

Well ID: 0455140204003
Loading map...
Location: 00/04-02-045-14W5/3
Location Alias: 00/04-02-45-14 W5M
Location Alias 2: 00/04-02-045-14 W5/03
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 14
Section: 02
County/Municipality: Yellowhead County
Well Name: FAIRBORNE BRAZR 4-2-45-14
Operator Name: Tourmaline Oil Corp.
License Number: 0326308
License Date: 2005-02-14
License Status: Suspension
Spud Date: 2005-03-01
Final Drill Date: 2005-03-09
Well Total Depth: 1981.00 m
Surface Hole Latitude: 52.846961
Surface Hole Longitude: -115.931974

For data sources see[1][2]

Well History

Date Event
2005-02-14 Obtained License
2005-03-02 Surface Casing Operation Performed
2005-03-09 Finished Drilling
2005-03-09 Well Mode changed to Drilled and Cased
2005-03-10 Well Log Performed
2005-03-11 Production Casing Operation Performed
2005-03-12 Rig Released
2005-03-15 Well Log Performed
2005-03-16 Well Log Performed
2005-03-22 Perforation Treatment Performed - Bridge Plug No Cement Required
2005-03-23 Perforation Treatment Performed - Jet Perforation
2005-03-23 Well Log Performed
2005-03-25 Perforation Treatment Performed - Fractured
2005-03-26 Perforation Treatment Performed - Fractured
2006-02-04 Well Log Performed
2006-02-05 Perforation Treatment Performed - Cement Squeeze
2006-02-05 Plug Back Performed
2006-02-11 Perforation Treatment Performed - Jet Perforation
2006-02-12 Perforation Treatment Performed - Fractured
2006-02-27 Perforation Treatment Performed - Jet Perforation
2006-03-08 Perforation Treatment Performed - Fractured
2006-03-18 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-03-22 Bridge Plug, No Cement 1833.00 1834.00 0
2006-02-12 Fracture 903.00 1031.50 0
2006-02-27 Perforation 788.50 790.00 17
2006-02-27 Perforation 691.50 694.50 17
2006-02-27 Perforation 609.00 611.00 17
2006-02-27 Perforation 517.00 519.00 17
2006-03-08 Fracture 788.50 790.00 0
2006-03-08 Fracture 691.50 694.50 0
2006-03-08 Fracture 609.00 611.00 0
2006-03-08 Fracture 517.00 519.00 0
2005-03-23 Perforation 1810.00 1814.50 17
2005-03-23 Perforation 1301.00 1303.00 17
2005-03-25 Fracture 1810.00 1814.50 0
2005-03-26 Fracture 1301.00 1303.00 0
2006-02-05 Cement Squeeze 1301.00 1303.00 0
2006-02-11 Perforation 1030.50 1031.50 4
2006-02-11 Perforation 941.60 942.00 2
2006-02-11 Perforation 903.00 904.00 2

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2006-03-29 No Incident Encountered 0.00 0.00
2017-06-13 No Incident Encountered 0.00 0.00

For data sources see[5]

References