X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455122914000

Well Details

Well ID: 0455122914000
Loading map...
Location: 00/14-29-045-12W5/0
Location Alias: 00/14-29-45-12 W5M
Location Alias 2: 00/14-29-045-12 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 12
Section: 29
County/Municipality: Yellowhead County
Well Name: BELLATRIX HZ BRAZR 14-29-45-12
Operator Name: Bellatrix Exploration Ltd.
License Number: 0465729
License Date: 2014-03-13
License Status: Issued
Spud Date: 2014-07-03
Final Drill Date: 2014-08-01
Well Total Depth: 3825.00 m
Surface Hole Latitude: 52.900475
Surface Hole Longitude: -115.716613

For data sources see[1][2]

Well History

Date Event
2014-03-13 Obtained License
2014-07-07 Surface Casing Operation Performed
2014-07-09 Well Log Performed
2014-07-15 Direction Drilling Operation Performed - Deviate
2014-07-17 Well Log Performed
2014-07-18 Well Log Performed
2014-07-20 Well Log Performed
2014-07-27 Intermediate Casing Operation Performed
2014-07-28 Direction Drilling Operation Performed - Horizontal
2014-08-01 Finished Drilling
2014-08-01 Well Log Performed
2014-08-01 Well Mode changed to Drilled and Cased
2014-08-04 Liner Casing Operation Performed
2014-08-05 Rig Released
2014-08-14 Well Log Performed
2014-08-20 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-20 Perforation Treatment Performed - Open-Hole Completion
2014-08-21 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-23 Well Began Production
2014-08-23 Well Fluid changed to Crude Oil
2014-08-23 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-07-03 Beaver Drilling Ltd. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-07-15 1776.10 Deviate (5 - 79 degrees)
2014-07-28 2486.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-08-20 Open Hole/Barefoot Completion 3820.00 3825.00 0
2014-08-20 Multi-Stage Fracture 3178.20 3178.30 0
2014-08-20 Multi-Stage Fracture 3098.40 3098.50 0
2014-08-20 Multi-Stage Fracture 3018.50 3018.60 0
2014-08-21 Multi-Stage Fracture 2951.60 2951.70 0
2014-08-21 Multi-Stage Fracture 2871.80 2871.90 0
2014-08-21 Multi-Stage Fracture 2792.30 2792.40 0
2014-08-21 Multi-Stage Fracture 2712.40 2712.50 0
2014-08-21 Multi-Stage Fracture 2632.50 2632.60 0
2014-08-21 Multi-Stage Fracture 2566.90 2567.00 0
2014-08-21 Multi-Stage Fracture 2500.00 2500.10 0
2014-08-20 Multi-Stage Fracture 3797.80 3797.90 0
2014-08-20 Multi-Stage Fracture 3724.20 3724.30 0
2014-08-20 Multi-Stage Fracture 3644.40 3644.50 0
2014-08-20 Multi-Stage Fracture 3564.50 3564.60 0
2014-08-20 Multi-Stage Fracture 3484.70 3484.80 0
2014-08-20 Multi-Stage Fracture 3404.80 3404.90 0
2014-08-20 Multi-Stage Fracture 3337.90 3338.00 0
2014-08-20 Multi-Stage Fracture 3258.00 3258.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-20 2014-08-21 2,201 3,278 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 80.9689 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.3119 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.9455 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.4593 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0121 N/A
Water 7732-18-5 100 0.0126 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1829 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0841 N/A
Ethoxylated phenolic resin 8300 100 0.0856 N/A
Isobutyl ketone 8300 100 0.0844 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0707 N/A
Organic acid salts 1 8300 100 0.0841 N/A
Organic acid salts 2 8300 100 0.085 N/A
Organic acid salts 3 8300 100 0.0856 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 6.4959 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0816 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-08-20 2014-08-20 Central Water Distribution Facility 2981

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 3090 0.0 0.0 0.0
2015 8630 0.0 0.0 0.0
2016 8670 0.0 0.0 0.0
2017 8718 0.0 0.0 0.0
2018 8476 0.0 0.0 0.0
2019 8648 0.0 0.0 0.0
2020 2089 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-08-05 No Incident Encountered 0.00 0.00
2014-08-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References