X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455113011002

Well Details

Well ID: 0455113011002
Loading map...
Location: 00/11-30-045-11W5/2
Location Alias: 00/11-30-45-11 W5M
Location Alias 2: 00/11-30-045-11 W5/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 11
Section: 30
County/Municipality: Brazeau County
Well Name: CDN-SUP AMOCO BRAZR 11-30-45-11
Operator Name: ExxonMobil Canada Resources Company
License Number: 0045469
License Date: 1973-03-20
License Status: RecCertified
Spud Date: 1973-03-23
Final Drill Date: 1975-08-07
Well Total Depth: 2830.10 m
Surface Hole Latitude: 52.911844
Surface Hole Longitude: -115.589843

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-03-20 Obtained License
1973-04-12 Drill Stem Test Performed
1973-04-20 Drill Stem Test Performed
1975-08-07 Finished Drilling
1975-08-07 Well Mode changed to Drilled and Cased
1975-08-11 Liner Casing Operation Performed
1975-08-13 Perforation Treatment Performed - Jet Perforation
1975-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-15 Perforation Treatment Performed - Acid Wash - No Pressure
1975-08-15 Perforation Treatment Performed - Fractured
1976-06-20 Perforation Treatment Performed - Cement Squeeze
1976-06-21 Perforation Treatment Performed - Jet Perforation
1976-12-14 Perforation Treatment Performed - Jet Perforation
1976-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-21 Perforation Treatment Performed - Cement Squeeze
1976-12-21 Perforation Treatment Performed - Jet Perforation
1976-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-23 Perforation Treatment Performed - Fractured
1977-01-07 Well Began Production
1977-01-07 Well Fluid changed to Crude Oil
1977-01-07 Well Mode changed to Flowing
1977-05-01 Well Fluid changed to Crude Oil
1977-05-01 Well Mode changed to Suspended
1988-04-30 Well Fluid changed to Crude Oil
1988-04-30 Well Mode changed to Abandoned
1988-05-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-08-13 Perforation 2772.50 2775.50 3
1976-12-15 Acid Treatment 2715.50 2724.90 0
1976-12-21 Cement Squeeze 2715.50 2724.90 0
1976-12-21 Perforation 2684.40 2688.00 7
1976-12-22 Acid Treatment 2684.40 2688.00 0
1976-12-23 Fracture 2684.40 2688.00 0
1975-08-13 Perforation 2777.00 2778.90 3
1975-08-15 Acid Wash 2772.50 2778.90 0
1975-08-15 Acid Treatment 2772.50 2778.90 0
1975-08-15 Fracture 2772.50 2778.90 0
1976-06-20 Cement Squeeze 2772.50 2778.90 0
1976-06-21 Perforation 2684.40 2685.30 13
1976-12-14 Perforation 2715.50 2719.40 7
1976-12-14 Perforation 2721.30 2724.90 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 56 0.0 0.0 0.0
1977 2121 0.0 0.0 0.0

For data sources see[5]

References