X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455113004000

Well Details

Well ID: 0455113004000
Loading map...
Location: 00/04-30-045-11W5/0
Location Alias: 00/04-30-45-11 W5M
Location Alias 2: 00/04-30-045-11 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 11
Section: 30
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 4-30-45-11
Operator Name: Ridgeback Resources Inc.
License Number: 0465828
License Date: 2014-03-20
License Status: Issued
Spud Date: 2014-08-01
Final Drill Date: 2014-08-11
Well Total Depth: 3697.00 m
Surface Hole Latitude: 52.917755
Surface Hole Longitude: -115.591607

For data sources see[1][2]

Well History

Date Event
2014-03-20 Obtained License
2014-08-03 Surface Casing Operation Performed
2014-08-05 Direction Drilling Operation Performed - Deviate
2014-08-06 Direction Drilling Operation Performed - Horizontal
2014-08-06 Well Log Performed
2014-08-07 Well Log Performed
2014-08-11 Finished Drilling
2014-08-11 Well Log Performed
2014-08-11 Well Mode changed to Drilled and Cased
2014-08-12 Production Casing Operation Performed
2014-08-12 Well Log Performed
2014-08-13 Perforation Treatment Performed - Open-Hole Completion
2014-08-13 Rig Released
2014-08-17 Well Log Performed
2014-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-28 Well Began Production
2014-08-28 Well Fluid changed to Crude Oil
2014-08-28 Well Mode changed to Flowing
2014-08-31 Well Log Performed
2014-10-19 Well Fluid changed to Crude Oil
2014-10-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-08-01 Ensign Drilling Inc. 360 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-08-05 1788.80 Deviate (5 - 79 degrees)
2014-08-06 2271.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-08-13 Open Hole/Barefoot Completion 3684.00 3697.00 0
2014-08-27 Multi-Stage Fracture 3127.30 3127.40 0
2014-08-27 Multi-Stage Fracture 3066.60 3066.70 0
2014-08-27 Multi-Stage Fracture 2991.50 2991.60 0
2014-08-27 Multi-Stage Fracture 2916.50 2916.60 0
2014-08-27 Multi-Stage Fracture 2857.10 2857.20 0
2014-08-27 Multi-Stage Fracture 2782.00 2782.10 0
2014-08-28 Multi-Stage Fracture 2708.70 2708.80 0
2014-08-28 Multi-Stage Fracture 2647.90 2648.00 0
2014-08-28 Multi-Stage Fracture 2572.70 2572.80 0
2014-08-28 Multi-Stage Fracture 2511.30 2511.40 0
2014-08-27 Multi-Stage Fracture 3674.10 3674.20 0
2014-08-28 Multi-Stage Fracture 2436.30 2436.40 0
2014-08-28 Multi-Stage Fracture 2375.40 2375.50 0
2014-08-27 Multi-Stage Fracture 3621.10 3621.20 0
2014-08-27 Multi-Stage Fracture 3546.00 3546.10 0
2014-08-27 Multi-Stage Fracture 3471.60 3471.70 0
2014-08-27 Multi-Stage Fracture 3410.90 3411.00 0
2014-08-27 Multi-Stage Fracture 3336.80 3336.90 0
2014-08-27 Multi-Stage Fracture 3275.90 3276.00 0
2014-08-27 Multi-Stage Fracture 3202.50 3202.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-27 2014-08-28 2,123 3,778 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.5787 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.2345 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.3172 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 3.2415 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0146 N/A
Water 7732-18-5 100 0.0152 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1982 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0921 N/A
Ethoxylated phenolic resin 8300 100 0.0937 N/A
Isobutyl ketone 8300 100 0.0922 N/A
Non-Hazardous Ingredients Trade Secret 100 0.106 N/A
Organic acid salts 1 8300 100 0.0921 N/A
Organic acid salts 2 8300 100 0.0933 N/A
Organic acid salts 3 8300 100 0.0937 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 4.517 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0954 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-08-17 2014-09-09 Surface Water - River 2252
2014-08-17 2014-09-09 Recycled Fracturing Water (treated at well site) 930
2014-08-17 2014-09-09 Recycled Fracturing Water (treated at well site) 624
2014-08-17 2014-09-09 Municipal Water 230

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 2574 0.0 0.0 0.0
2015 8518 0.0 0.0 0.0
2016 8731 0.0 0.0 0.0
2017 8734 0.0 0.0 0.0
2018 8742 0.0 0.0 0.0
2019 8449 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-08-13 No Incident Encountered 0.00 0.00
2014-09-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References