X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455112615000

Well Details

Well ID: 0455112615000
Loading map...
Location: 00/15-26-045-11W5/0
Location Alias: 00/15-26-45-11 W5M
Location Alias 2: 00/15-26-045-11 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 11
Section: 26
County/Municipality: Brazeau County
Well Name: BELLATRIX HZ PEMBINA 15-26-45-11
Operator Name: Bellatrix Exploration Ltd.
License Number: 0440474
License Date: 2011-12-06
License Status: Issued
Spud Date: 2012-02-04
Final Drill Date: 2012-02-23
Well Total Depth: 3478.00 m
Surface Hole Latitude: 52.900994
Surface Hole Longitude: -115.486913

For data sources see[1][2]

Well History

Date Event
2011-12-06 Obtained License
2012-02-04 Lost Circulation Occurred
2012-02-07 Surface Casing Operation Performed
2012-02-14 Direction Drilling Operation Performed - Horizontal
2012-02-16 Intermediate Casing Operation Performed
2012-02-16 Well Log Performed
2012-02-23 Finished Drilling
2012-02-23 Well Log Performed
2012-02-23 Well Mode changed to Drilled and Cased
2012-02-26 Rig Released
2012-03-01 Perforation Treatment Performed - Open-Hole Completion
2012-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-15 Well Began Production
2012-03-15 Well Fluid changed to Crude Oil
2012-03-15 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-04 Chinook Drilling Inc. 4 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-14 2155.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-01 Open Hole/Barefoot Completion 2155.00 3478.00 0
2012-03-14 Multi-Stage Fracture 2789.40 2864.70 0
2012-03-14 Multi-Stage Fracture 2718.70 2789.40 0
2012-03-14 Multi-Stage Fracture 2633.50 2718.70 0
2012-03-14 Multi-Stage Fracture 2562.60 2633.50 0
2012-03-14 Multi-Stage Fracture 2477.80 2562.60 0
2012-03-14 Multi-Stage Fracture 2404.50 2477.80 0
2012-03-14 Multi-Stage Fracture 2318.60 2404.50 0
2012-03-14 Multi-Stage Fracture 2247.70 2318.60 0
2012-03-14 Multi-Stage Fracture 2164.00 2247.70 0
2012-03-14 Multi-Stage Fracture 3430.90 3478.00 0
2012-03-14 Multi-Stage Fracture 3338.90 3413.40 0
2012-03-14 Multi-Stage Fracture 3254.00 3338.90 0
2012-03-14 Multi-Stage Fracture 3180.80 3254.00 0
2012-03-14 Multi-Stage Fracture 3095.10 3180.80 0
2012-03-14 Multi-Stage Fracture 3025.30 3095.10 0
2012-03-14 Multi-Stage Fracture 2951.80 3025.30 0
2012-03-14 Multi-Stage Fracture 2864.70 2951.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6492 0.0 0.0 0.0
2013 7981 0.0 0.0 0.0
2014 8601 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8591 0.0 0.0 0.0
2017 8753 0.0 0.0 0.0
2018 8555 0.0 0.0 0.0
2019 8344 0.0 0.0 0.0
2020 2039 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-04 Lost Circulation 72.00 125.00

For data sources see[8]

References