X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455111915020

Well Details

Well ID: 0455111915020
Loading map...
Location: 02/15-19-045-11W5/0
Location Alias: 02/15-19-45-11 W5M
Location Alias 2: 02/15-19-045-11 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 11
Section: 19
County/Municipality: Brazeau County
Well Name: WESTBRICK HZ PEMBINA 15-19-45-11
Operator Name: Westbrick Energy Ltd.
License Number: 0474459
License Date: 2015-02-02
License Status: Amended
Spud Date: 2015-02-12
Final Drill Date: 2015-03-02
Well Total Depth: 4007.00 m
Surface Hole Latitude: 52.886445
Surface Hole Longitude: -115.584372

For data sources see[1][2]

Well History

Date Event
2015-02-02 Obtained License
2015-02-13 Lost Circulation Occurred
2015-02-14 Surface Casing Operation Performed
2015-02-18 Direction Drilling Operation Performed - Deviate
2015-02-23 Intermediate Casing Operation Performed
2015-02-25 Well Log Performed
2015-02-26 Direction Drilling Operation Performed - Horizontal
2015-03-02 Finished Drilling
2015-03-02 Well Log Performed
2015-03-02 Well Mode changed to Drilled and Cased
2015-03-04 Production Casing Operation Performed
2015-03-04 Rig Released
2015-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-24 Well Began Production
2015-03-24 Well Fluid changed to Gas
2015-03-24 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-02-12 Chinook Drilling Inc. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-02-18 2252.50 Deviate (5 - 79 degrees)
2015-02-26 2722.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-03-07 Multi-Stage Fracture 3986.00 3986.50 0
2015-03-08 Multi-Stage Fracture 3720.20 3722.30 0
2015-03-08 Multi-Stage Fracture 3690.00 3692.10 0
2015-03-08 Multi-Stage Fracture 3659.30 3661.60 0
2015-03-08 Multi-Stage Fracture 3628.00 3630.00 0
2015-03-08 Multi-Stage Fracture 3597.50 3599.50 0
2015-03-08 Multi-Stage Fracture 3566.60 3568.70 0
2015-03-09 Multi-Stage Fracture 3536.70 3538.80 0
2015-03-09 Multi-Stage Fracture 3492.80 3494.80 0
2015-03-09 Multi-Stage Fracture 3464.00 3466.10 0
2015-03-09 Multi-Stage Fracture 3434.00 3436.10 0
2015-03-08 Multi-Stage Fracture 3958.30 3960.20 0
2015-03-09 Multi-Stage Fracture 3402.80 3404.90 0
2015-03-09 Multi-Stage Fracture 3358.70 3360.80 0
2015-03-09 Multi-Stage Fracture 3328.80 3330.90 0
2015-03-09 Multi-Stage Fracture 3284.50 3286.60 0
2015-03-09 Multi-Stage Fracture 3253.90 3256.00 0
2015-03-09 Multi-Stage Fracture 3223.20 3225.30 0
2015-03-09 Multi-Stage Fracture 3192.40 3194.40 0
2015-03-09 Multi-Stage Fracture 3147.30 3149.40 0
2015-03-09 Multi-Stage Fracture 3116.90 3119.00 0
2015-03-09 Multi-Stage Fracture 3073.40 3075.40 0
2015-03-08 Multi-Stage Fracture 3930.10 3932.20 0
2015-03-09 Multi-Stage Fracture 3043.40 3045.50 0
2015-03-09 Multi-Stage Fracture 3013.40 3015.50 0
2015-03-09 Multi-Stage Fracture 2982.30 2984.40 0
2015-03-10 Multi-Stage Fracture 2938.70 2940.80 0
2015-03-10 Multi-Stage Fracture 2907.80 2909.90 0
2015-03-10 Multi-Stage Fracture 2876.50 2878.60 0
2015-03-10 Multi-Stage Fracture 2845.80 2847.90 0
2015-03-10 Multi-Stage Fracture 2801.70 2803.80 0
2015-03-10 Multi-Stage Fracture 2771.20 2773.20 0
2015-03-08 Multi-Stage Fracture 3899.70 3901.70 0
2015-03-08 Multi-Stage Fracture 3870.10 3872.10 0
2015-03-08 Multi-Stage Fracture 3842.10 3844.20 0
2015-03-08 Multi-Stage Fracture 3811.40 3813.50 0
2015-03-08 Multi-Stage Fracture 3780.70 3782.80 0
2015-03-08 Multi-Stage Fracture 3750.40 3752.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-07 2015-03-07 2,582 0 N/A
2 2015-03-07 2015-03-10 2,582 5,959 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 3.3648 N/A
AI-7NR Trican Corrosion Inhibitor modified propargyl alcohol Trade Secret 100 0.0125 N/A
propargyl alcohol 107-19-7 100 0.0125 N/A
IC-2 Trican Iron Control sodium erythorbate 6381-77-7 100 0.0187 N/A
ASA-60W Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.0425 N/A
dipropylene glycol 25265-71-8 100 0.0425 N/A
sodium hexyldiphenyl ether sulfonate 147732-60-3 100 0.0425 N/A
2 water Not Available 100 83.6113 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 4.6392 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 6.1699 N/A
SBExcel 20/40 Trican silica crystalline 14808-60-7 100 3.1052 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0106 N/A
dibromoacetonitrile 3252-43-5 100 0.0106 N/A
non-hazardous ingredients Not Available 100 0.0106 N/A
polyethylene glycol 25322-68-3 100 0.0106 N/A
sodium bromide 7647-15-6 100 0.0106 N/A
EnCap-HP Trican Breaker ammonium persulfate 7727-54-0 100 0.0095 N/A
cured acrylic resin Not Available 100 0.0095 N/A
silica crystalline 14808-60-7 100 0.0095 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0053 N/A
DRA-90 Trican Buffer non-hazardous ingredients Not Available 100 0.0333 N/A
pH-6 Trican Buffer ethylene glycol 107-21-1 100 0.0334 N/A
formic acid 64-18-6 100 0.0334 N/A
water Not Available 100 0.0334 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1597 N/A
non-hazardous ingredients Not Available 100 0.1597 N/A
WXB-77 Trican Crosslinker borate salts 1319-33-1 100 0.141 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.141 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0643 N/A
propylene glycol 57-55-6 100 0.0643 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0545 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0545 N/A
non-hazardous ingredients Not Available 100 0.0545 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.0767 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-02-13 2015-02-23 Surface Water - River 2095
2015-03-07 2015-03-08 Surface Water - River 2586
2015-02-10 2015-02-10 Surface Water - Runoff 305
2015-01-28 2015-01-28 Surface Water - River 690
2015-01-27 2015-01-27 Surface Water - River 800
2015-01-27 2015-01-27 Recycled Fracturing Water (treated at well site) 1841

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 6431 0.0 0.0 0.0
2016 8304 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8687 0.0 0.0 0.0
2019 7622 0.0 0.0 0.0
2020 408 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-13 Lost Circulation 31.00 35.00
2015-03-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References