X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455111013020

Well Details

Well ID: 0455111013020
Loading map...
Location: 02/13-10-045-11W5/0
Location Alias: 02/13-10-45-11 W5M
Location Alias 2: 02/13-10-045-11 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 11
Section: 10
County/Municipality: Brazeau County
Well Name: BELLATRIX HZ BRAZR 13-10-45-11
Operator Name: Bellatrix Exploration Ltd.
License Number: 0443814
License Date: 2012-02-06
License Status: Issued
Spud Date: 2012-09-13
Final Drill Date: 2012-10-01
Well Total Depth: 3663.00 m
Surface Hole Latitude: 52.855984
Surface Hole Longitude: -115.522097

For data sources see[1][2]

Well History

Date Event
2012-02-06 Obtained License
2012-09-13 Lost Circulation Occurred
2012-09-15 Surface Casing Operation Performed
2012-09-18 Well Log Performed
2012-09-19 Direction Drilling Operation Performed - Deviate
2012-09-22 Direction Drilling Operation Performed - Horizontal
2012-09-24 Intermediate Casing Operation Performed
2012-10-01 Finished Drilling
2012-10-01 Well Mode changed to Drilled and Cased
2012-10-03 Liner Casing Operation Performed
2012-10-04 Rig Released
2012-10-06 Well Log Performed
2012-10-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-14 Well Began Production
2012-10-14 Well Fluid changed to Crude Oil
2012-10-14 Well Mode changed to Flowing
2016-01-29 Well Fluid changed to Crude Oil
2016-01-29 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-13 Chinook Drilling Inc. 15 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-19 1761.00 Deviate (5 - 79 degrees)
2012-09-22 2219.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-13 Multi-Stage Fracture 3635.20 3635.30 0
2012-10-13 Multi-Stage Fracture 2899.80 2899.90 0
2012-10-13 Multi-Stage Fracture 2814.80 2814.90 0
2012-10-13 Multi-Stage Fracture 2745.30 2745.40 0
2012-10-13 Multi-Stage Fracture 2650.30 2650.40 0
2012-10-14 Multi-Stage Fracture 2580.90 2581.00 0
2012-10-14 Multi-Stage Fracture 2497.20 2497.30 0
2012-10-14 Multi-Stage Fracture 2411.90 2412.00 0
2012-10-14 Multi-Stage Fracture 2328.60 2328.70 0
2012-10-13 Multi-Stage Fracture 3557.20 3557.30 0
2012-10-13 Multi-Stage Fracture 3476.40 3476.50 0
2012-10-13 Multi-Stage Fracture 3395.00 3395.10 0
2012-10-13 Multi-Stage Fracture 3308.90 3309.00 0
2012-10-13 Multi-Stage Fracture 3228.30 3228.40 0
2012-10-13 Multi-Stage Fracture 3148.80 3148.90 0
2012-10-13 Multi-Stage Fracture 3066.00 3066.10 0
2012-10-13 Multi-Stage Fracture 2983.50 2983.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1860 0.0 0.0 0.0
2013 8690 0.0 0.0 0.0
2014 8433 0.0 0.0 0.0
2015 8423 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8469 0.0 0.0 0.0
2019 8466 0.0 0.0 0.0
2020 2069 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-13 Lost Circulation 56.00 613.00
2012-10-18 No Incident Encountered 0.00 0.00

For data sources see[8]

References