X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455110204020

Well Details

Well ID: 0455110204020
Loading map...
Location: 02/04-02-045-11W5/0
Location Alias: 02/04-02-45-11 W5M
Location Alias 2: 02/04-02-045-11 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 11
Section: 02
County/Municipality: Brazeau County
Well Name: BELLATRIX UMNV PEMBINA 4-2-45-11
Operator Name: Bellatrix Exploration Ltd.
License Number: 0492542
License Date: 2018-12-03
License Status: Issued
Spud Date: 2018-12-28
Final Drill Date: 2019-01-04
Well Total Depth: 4448.00 m
Surface Hole Latitude: 52.858509
Surface Hole Longitude: -115.477925

For data sources see[1][2]

Well History

Date Event
2018-12-03 Obtained License
2018-12-29 Surface Casing Operation Performed
2018-12-30 Direction Drilling Operation Performed - Deviate
2019-01-01 Direction Drilling Operation Performed - Horizontal
2019-01-01 Well Log Performed
2019-01-04 Finished Drilling
2019-01-04 Well Log Performed
2019-01-04 Well Mode changed to Drilled and Cased
2019-01-06 Production Casing Operation Performed
2019-01-06 Rig Released
2019-01-09 Perforation Treatment Performed - Open-Hole Completion
2019-01-11 Well Log Performed
2019-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-21 Well Fluid changed to Gas
2019-01-21 Well Mode changed to Testing
2019-01-22 Well Fluid changed to Gas
2019-01-22 Well Mode changed to Test Completed
2019-01-23 Well Began Production
2019-01-23 Well Fluid changed to Gas
2019-01-23 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-12-28 Akita Drilling Ltd. 34 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-12-30 724.50 Deviate (5 - 79 degrees)
2019-01-01 2575.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-09 Open Hole/Barefoot Completion 4442.00 4448.00 0
2019-01-21 Multi-Stage Fracture 3777.90 3778.00 0
2019-01-21 Multi-Stage Fracture 3704.20 3704.30 0
2019-01-21 Multi-Stage Fracture 3618.20 3618.30 0
2019-01-21 Multi-Stage Fracture 3544.80 3544.90 0
2019-01-21 Multi-Stage Fracture 3456.40 3456.50 0
2019-01-21 Multi-Stage Fracture 3382.70 3382.80 0
2019-01-21 Multi-Stage Fracture 3294.00 3294.10 0
2019-01-21 Multi-Stage Fracture 3206.10 3206.20 0
2019-01-21 Multi-Stage Fracture 3131.90 3132.00 0
2019-01-21 Multi-Stage Fracture 3045.90 3046.00 0
2019-01-21 Multi-Stage Fracture 4416.10 4416.20 0
2019-01-21 Multi-Stage Fracture 2973.00 2973.10 0
2019-01-21 Multi-Stage Fracture 2884.90 2885.00 0
2019-01-21 Multi-Stage Fracture 2810.70 2810.80 0
2019-01-21 Multi-Stage Fracture 2736.70 2736.80 0
2019-01-21 Multi-Stage Fracture 4351.30 4351.40 0
2019-01-21 Multi-Stage Fracture 4276.90 4277.00 0
2019-01-21 Multi-Stage Fracture 4189.30 4189.40 0
2019-01-21 Multi-Stage Fracture 4115.60 4115.70 0
2019-01-21 Multi-Stage Fracture 4028.70 4028.80 0
2019-01-21 Multi-Stage Fracture 3955.00 3955.10 0
2019-01-21 Multi-Stage Fracture 3866.60 3866.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-21 2019-01-21 2,431 4,022 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.6723 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.4962 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 13.4799 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0109 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0109 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0109 N/A
Polyethylene glycol 25322-68-3 100 0.0109 N/A
Sodium bromide 7647-15-6 100 0.0109 N/A
DWP-913. Clay Control Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1798 N/A
DynaRate 6104. Friction Reducer Calfrac Friction Reducer Ammonium Chloride 12125-02-9 100 0.0869 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0869 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0869 N/A
Oleamide Trade Secret 100 0.0869 N/A
CalSurf 9400. Flowback Surfactant Calfrac Surfactant Ethoxylated Alcohols Trade Secret 100 0.0737 N/A
Methanol 67-56-1 100 0.0737 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0737 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-11 2019-01-14 Surface Water - Runoff 3491
2019-01-11 2019-01-14 Surface Water - Runoff 989

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7813 0.0 0.0 0.0
2020 2156 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-06 No Incident Encountered 0.00 0.00
2019-01-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References