If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455110204000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.859054,"lon":-115.49587,"icon":""}]} |
Location: 00/04-02-045-11W5/0 | |
Location Alias: 00/04-02-45-11 W5M | |
Location Alias 2: 00/04-02-045-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 11 | |
Section: 02 | |
County/Municipality: Brazeau County | |
Well Name: BELLATRIX HZ BRAZR 4-2-45-11 | |
Operator Name: Bellatrix Exploration Ltd. | |
License Number: 0442539 | |
License Date: 2012-01-09 | |
License Status: Issued | |
Spud Date: 2012-01-26 | |
Final Drill Date: 2012-02-13 | |
Well Total Depth: 3605.00 m | |
Surface Hole Latitude: 52.859054 | |
Surface Hole Longitude: -115.495870 |
Date | Event |
---|---|
2012-01-09 | Obtained License |
2012-01-26 | Lost Circulation Occurred |
2012-01-29 | Surface Casing Operation Performed |
2012-01-30 | Well Log Performed |
2012-02-04 | Direction Drilling Operation Performed - Horizontal |
2012-02-05 | Intermediate Casing Operation Performed |
2012-02-06 | Well Log Performed |
2012-02-13 | Finished Drilling |
2012-02-13 | Well Mode changed to Drilled and Cased |
2012-02-16 | Rig Released |
2012-02-21 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-29 | Well Began Production |
2012-02-29 | Well Fluid changed to Crude Oil |
2012-02-29 | Well Mode changed to Flowing |
2013-08-01 | Well Fluid changed to Crude Oil |
2013-08-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-26 | Chinook Drilling Inc. | 10 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-04 | 2261.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-21 | Open Hole/Barefoot Completion | 2227.00 | 3605.00 | 0 |
2012-02-27 | Multi-Stage Fracture | 2902.10 | 2986.90 | 0 |
2012-02-27 | Multi-Stage Fracture | 2831.80 | 2902.10 | 0 |
2012-02-27 | Multi-Stage Fracture | 2745.50 | 2831.80 | 0 |
2012-02-27 | Multi-Stage Fracture | 2673.10 | 2745.50 | 0 |
2012-02-27 | Multi-Stage Fracture | 2588.30 | 2673.10 | 0 |
2012-02-27 | Multi-Stage Fracture | 2515.80 | 2588.30 | 0 |
2012-02-27 | Multi-Stage Fracture | 2429.80 | 2515.80 | 0 |
2012-02-27 | Multi-Stage Fracture | 2358.80 | 2429.80 | 0 |
2012-02-28 | Multi-Stage Fracture | 2272.60 | 2358.80 | 0 |
2012-02-26 | Multi-Stage Fracture | 3559.00 | 3605.00 | 0 |
2012-02-26 | Multi-Stage Fracture | 3455.60 | 3541.10 | 0 |
2012-02-26 | Multi-Stage Fracture | 3384.70 | 3455.60 | 0 |
2012-02-26 | Multi-Stage Fracture | 3299.70 | 3384.70 | 0 |
2012-02-26 | Multi-Stage Fracture | 3227.10 | 3299.70 | 0 |
2012-02-26 | Multi-Stage Fracture | 3141.20 | 3227.10 | 0 |
2012-02-26 | Multi-Stage Fracture | 3069.30 | 3141.20 | 0 |
2012-02-26 | Multi-Stage Fracture | 2986.90 | 3069.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7110 | 0.0 | 0.0 | 0.0 |
2013 | 8498 | 0.0 | 0.0 | 0.0 |
2014 | 8601 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8524 | 0.0 | 0.0 | 0.0 |
2019 | 8485 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-01-26 | Lost Circulation | 80.00 | 610.00 |
For data sources see[8]