X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455093101000

Well Details

Well ID: 0455093101000
Loading map...
Location: 00/01-31-045-09W5/0
Location Alias: 00/01-31-45-09 W5M
Location Alias 2: 00/01-31-045-09 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 09
Section: 31
County/Municipality: Brazeau County
Well Name: CVE PEMBINA 1-31-45-9
Operator Name: Cenovus Energy Inc.
License Number: 0422269
License Date: 2010-07-28
License Status: Issued
Spud Date: 2010-09-05
Final Drill Date: 2010-09-26
Well Total Depth: 3084.00 m
Surface Hole Latitude: 52.917825
Surface Hole Longitude: -115.307711

For data sources see[1][2]

Well History

Date Event
2010-07-28 Obtained License
2010-09-05 Lost Circulation Occurred
2010-09-08 Surface Casing Operation Performed
2010-09-10 Well Log Performed
2010-09-12 Direction Drilling Operation Performed - Horizontal
2010-09-14 Intermediate Casing Operation Performed
2010-09-26 Finished Drilling
2010-09-26 Well Mode changed to Drilled and Cased
2010-09-30 Liner Casing Operation Performed
2010-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-07 Well Log Performed
2010-10-11 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-21 Rig Released
2010-11-17 Well Began Production
2010-11-17 Well Fluid changed to Crude Oil
2010-11-17 Well Mode changed to Flowing
2018-09-15 Well Fluid changed to Crude Oil
2018-09-15 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-09-12 1568.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-07 Multi-Stage Fracture 3045.40 3045.90 0
2010-10-11 Multi-Stage Fracture 2114.60 2115.10 0
2010-10-11 Multi-Stage Fracture 2030.90 2031.40 0
2010-10-11 Multi-Stage Fracture 2944.00 2944.50 0
2010-10-11 Multi-Stage Fracture 2847.40 2847.90 0
2010-10-11 Multi-Stage Fracture 2738.70 2739.20 0
2010-10-11 Multi-Stage Fracture 2630.00 2630.50 0
2010-10-11 Multi-Stage Fracture 2522.30 2522.80 0
2010-10-11 Multi-Stage Fracture 2426.20 2426.70 0
2010-10-11 Multi-Stage Fracture 2330.20 2330.70 0
2010-10-11 Multi-Stage Fracture 2222.80 2223.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 567 0.0 0.0 0.0
2011 7390 0.0 0.0 0.0
2012 6128 0.0 0.0 0.0
2013 8461 0.0 0.0 0.0
2014 7420 0.0 0.0 0.0
2015 7770 0.0 0.0 0.0
2016 8193 0.0 0.0 0.0
2017 8313 0.0 0.0 0.0
2018 8533 0.0 0.0 0.0
2019 8681 0.0 0.0 0.0
2020 2174 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-09-05 Lost Circulation 65.00 70.00

For data sources see[7]

References