X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455092601000

Well Details

Well ID: 0455092601000
Loading map...
Location: 00/01-26-045-09W5/0
Location Alias: 00/01-26-45-09 W5M
Location Alias 2: 00/01-26-045-09 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 09
Section: 26
County/Municipality: Clearwater County
Well Name: COPOL ET AL 100 HZ PEMBINA 1-26-45-9
Operator Name: Bellatrix Exploration Ltd.
License Number: 0422809
License Date: 2010-08-19
License Status: Issued
Spud Date: 2011-01-29
Final Drill Date: 2011-02-12
Well Total Depth: 3460.00 m
Surface Hole Latitude: 52.916829
Surface Hole Longitude: -115.189504

For data sources see[1][2]

Well History

Date Event
2010-08-19 Obtained License
2011-02-01 Surface Casing Operation Performed
2011-02-02 Well Log Performed
2011-02-04 Direction Drilling Operation Performed - Horizontal
2011-02-05 Well Log Performed
2011-02-07 Intermediate Casing Operation Performed
2011-02-07 Well Log Performed
2011-02-08 Well Log Performed
2011-02-09 Lost Circulation Occurred
2011-02-10 Lost Circulation Occurred
2011-02-12 Finished Drilling
2011-02-12 Well Log Performed
2011-02-12 Well Mode changed to Drilled and Cased
2011-02-13 Liner Casing Operation Performed
2011-02-13 Perforation Treatment Performed - Open-Hole Completion
2011-02-14 Rig Released
2011-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-27 Well Fluid changed to Gas
2011-02-27 Well Mode changed to Testing
2011-03-08 Well Fluid changed to Gas
2011-03-08 Well Mode changed to Test Completed
2011-05-04 Well Began Production
2011-05-04 Well Fluid changed to Gas
2011-05-04 Well Mode changed to Flowing
2016-01-18 Well Fluid changed to Gas
2016-01-18 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-04 1860.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-13 Open Hole/Barefoot Completion 3456.00 3460.00 0
2011-02-26 Multi-Stage Fracture 2600.30 2600.80 0
2011-02-26 Multi-Stage Fracture 2488.00 2488.50 0
2011-02-26 Multi-Stage Fracture 2348.80 2349.30 0
2011-02-25 Multi-Stage Fracture 3435.90 3436.40 0
2011-02-25 Multi-Stage Fracture 3431.80 3432.30 0
2011-02-25 Multi-Stage Fracture 3331.50 3332.00 0
2011-02-25 Multi-Stage Fracture 3219.80 3220.30 0
2011-02-25 Multi-Stage Fracture 3096.00 3096.50 0
2011-02-25 Multi-Stage Fracture 2972.20 2972.70 0
2011-02-25 Multi-Stage Fracture 2836.50 2837.00 0
2011-02-26 Multi-Stage Fracture 2712.20 2712.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5700 0.0 0.0 0.0
2012 8451 0.0 0.0 0.0
2013 8198 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8279 0.0 0.0 0.0
2016 8769 0.0 0.0 0.0
2017 8614 0.0 0.0 0.0
2018 7927 0.0 0.0 0.0
2019 6662 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-02-09 Lost Circulation 2455.00 2490.00
2011-02-10 Lost Circulation 2850.00 2940.00

For data sources see[7]

References