X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455051908000

Well Details

Well ID: 0455051908000
Loading map...
Location: 00/08-19-045-05W5/0
Location Alias: 00/08-19-45-05 W5M
Location Alias 2: 00/08-19-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 19
County/Municipality: County of Wetaskiwin No. 10
Well Name: TAC PEMBINA 8-19-45-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0427528
License Date: 2010-12-10
License Status: Suspension
Spud Date: 2011-03-13
Final Drill Date: 2011-03-23
Well Total Depth: 3176.00 m
Surface Hole Latitude: 52.889856
Surface Hole Longitude: -114.730734

For data sources see[1][2]

Well History

Date Event
2010-12-10 Obtained License
2011-03-14 Surface Casing Operation Performed
2011-03-15 Well Log Performed
2011-03-16 Direction Drilling Operation Performed - Horizontal
2011-03-23 Finished Drilling
2011-03-23 Well Mode changed to Drilled and Cased
2011-03-25 Production Casing Operation Performed
2011-03-25 Rig Released
2011-08-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-16 Perforation Treatment Performed - Open-Hole Completion
2011-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-13 Well Began Production
2011-10-13 Well Fluid changed to Crude Oil
2011-10-13 Well Mode changed to Pumping
2019-02-01 Well Fluid changed to Crude Oil
2019-02-01 Well Mode changed to Suspended
2020-02-01 Well Fluid changed to Crude Oil
2020-02-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-16 1220.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-16 Open Hole/Barefoot Completion 3175.80 3176.00 0
2011-08-31 Multi-Stage Fracture 2511.60 2511.70 0
2011-08-31 Multi-Stage Fracture 2437.30 2437.40 0
2011-08-31 Multi-Stage Fracture 2336.10 2336.20 0
2011-08-31 Multi-Stage Fracture 2275.20 2275.30 0
2011-08-31 Multi-Stage Fracture 2201.60 2201.70 0
2011-08-31 Multi-Stage Fracture 2127.20 2127.30 0
2011-08-31 Multi-Stage Fracture 2052.60 2052.70 0
2011-08-31 Multi-Stage Fracture 1978.00 1978.10 0
2011-08-31 Multi-Stage Fracture 1889.80 1890.00 0
2011-08-16 Multi-Stage Fracture 3114.00 3114.10 0
2011-08-31 Multi-Stage Fracture 3066.60 3066.70 0
2011-08-31 Multi-Stage Fracture 2980.50 2980.60 0
2011-08-31 Multi-Stage Fracture 2905.90 2906.00 0
2011-08-31 Multi-Stage Fracture 2820.40 2820.50 0
2011-08-31 Multi-Stage Fracture 2746.40 2746.50 0
2011-08-31 Multi-Stage Fracture 2674.30 2674.40 0
2011-08-31 Multi-Stage Fracture 2586.00 2586.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1784 0.0 0.0 0.0
2012 8458 0.0 0.0 0.0
2013 8291 0.0 0.0 0.0
2014 5989 0.0 0.0 0.0
2015 7605 0.0 0.0 0.0
2016 4659 0.0 0.0 0.0
2020 971 0.0 0.0 0.0

For data sources see[6]

References