X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455051604000

Well Details

Well ID: 0455051604000
Loading map...
Location: 00/04-16-045-05W5/0
Location Alias: 00/04-16-45-05 W5M
Location Alias 2: 00/04-16-045-05 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 05
Section: 16
County/Municipality: Buck Lake 133C
Well Name: CLEARVIEW PEMBINA 4-16-45-5
Operator Name: Clearview Resources Ltd.
License Number: 0435243
License Date: 2011-07-18
License Status: Issued
Spud Date: 2011-08-19
Final Drill Date: 2011-09-04
Well Total Depth: 3071.00 m
Surface Hole Latitude: 52.876482
Surface Hole Longitude: -114.655038

For data sources see[1][2]

Well History

Date Event
2011-07-18 Obtained License
2011-08-20 Surface Casing Operation Performed
2011-08-23 Direction Drilling Operation Performed - Horizontal
2011-08-28 Intermediate Casing Operation Performed
2011-08-28 Well Log Performed
2011-09-04 Finished Drilling
2011-09-04 Well Mode changed to Drilled and Cased
2011-09-08 Liner Casing Operation Performed
2011-09-09 Perforation Treatment Performed - Open-Hole Completion
2011-09-09 Rig Released
2011-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-02 Well Began Production
2011-10-02 Well Fluid changed to Crude Oil
2011-10-02 Well Mode changed to Pumping
2020-03-31 Well Fluid changed to Crude Oil
2020-03-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-23 1251.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-09 Open Hole/Barefoot Completion 3065.00 3071.00 0
2011-10-02 Multi-Stage Fracture 2496.00 2496.10 0
2011-10-02 Multi-Stage Fracture 2423.30 2423.40 0
2011-10-02 Multi-Stage Fracture 2349.50 2349.60 0
2011-10-02 Multi-Stage Fracture 2275.80 2275.90 0
2011-10-02 Multi-Stage Fracture 2215.70 2215.80 0
2011-10-02 Multi-Stage Fracture 2142.00 2142.10 0
2011-10-02 Multi-Stage Fracture 2068.40 2068.50 0
2011-10-02 Multi-Stage Fracture 1994.70 1994.80 0
2011-10-02 Multi-Stage Fracture 1935.50 1935.60 0
2011-10-02 Multi-Stage Fracture 1876.60 1876.70 0
2011-10-01 Multi-Stage Fracture 3055.70 3055.80 0
2011-10-01 Multi-Stage Fracture 2990.00 2990.10 0
2011-10-01 Multi-Stage Fracture 2903.50 2903.60 0
2011-10-01 Multi-Stage Fracture 2844.30 2844.40 0
2011-10-01 Multi-Stage Fracture 2772.60 2772.70 0
2011-10-01 Multi-Stage Fracture 2698.60 2698.70 0
2011-10-01 Multi-Stage Fracture 2625.90 2626.00 0
2011-10-02 Multi-Stage Fracture 2554.20 2554.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1571 0.0 0.0 0.0
2012 8729 0.0 0.0 0.0
2013 8484 0.0 0.0 0.0
2014 8180 0.0 0.0 0.0
2015 4992 0.0 0.0 0.0
2016 7381 0.0 0.0 0.0
2017 7634 0.0 0.0 0.0
2018 7721 0.0 0.0 0.0
2019 8231 0.0 0.0 0.0
2020 1920 0.0 0.0 0.0

For data sources see[6]

References