X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455031714022

Well Details

Well ID: 0455031714022
Loading map...
Location: 02/14-17-045-03W5/2
Location Alias: 02/14-17-45-03 W5M
Location Alias 2: 02/14-17-045-03 W5/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 03
Section: 17
County/Municipality: Ponoka County
Well Name: COREX 102 HZ CRYSTAL 14-17-45-3
Operator Name: Journey Energy Inc.
License Number: 0446159
License Date: 2012-05-29
License Status: Suspension
Spud Date: 2012-09-28
Final Drill Date: 2012-10-24
Well Total Depth: 3048.00 m
Surface Hole Latitude: 52.886077
Surface Hole Longitude: -114.384961

For data sources see[1][2]

Well History

Date Event
2012-05-29 Obtained License
2012-09-28 Surface Casing Operation Performed
2012-10-01 Direction Drilling Operation Performed - Horizontal
2012-10-10 Well Log Performed
2012-10-14 Intermediate Casing Operation Performed
2012-10-24 Finished Drilling
2012-10-24 Well Mode changed to Drilled and Cased
2012-10-27 Liner Casing Operation Performed
2012-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-27 Perforation Treatment Performed - Open-Hole Completion
2012-10-27 Rig Released
2012-12-10 Well Began Production
2012-12-10 Well Fluid changed to Crude Oil
2012-12-10 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-10-01 1326.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-27 Multi-Stage Fracture 1962.10 1962.90 0
2012-10-27 Multi-Stage Fracture 2669.20 2670.00 0
2012-10-27 Multi-Stage Fracture 2755.30 2756.10 0
2012-10-27 Multi-Stage Fracture 2827.90 2828.70 0
2012-10-27 Multi-Stage Fracture 2913.90 2914.70 0
2012-10-27 Multi-Stage Fracture 3006.80 3007.60 0
2012-10-27 Open Hole/Barefoot Completion 3043.00 3048.00 0
2012-10-27 Multi-Stage Fracture 2048.20 2049.00 0
2012-10-27 Multi-Stage Fracture 2120.80 2121.60 0
2012-10-27 Multi-Stage Fracture 2206.80 2207.60 0
2012-10-27 Multi-Stage Fracture 2279.40 2280.20 0
2012-10-27 Multi-Stage Fracture 2365.50 2366.30 0
2012-10-27 Multi-Stage Fracture 2438.00 2438.80 0
2012-10-27 Multi-Stage Fracture 2510.60 2511.40 0
2012-10-27 Multi-Stage Fracture 2596.70 2597.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 528 0.0 0.0 0.0
2013 8649 0.0 0.0 0.0
2014 8751 0.0 0.0 0.0
2015 8433 0.0 0.0 0.0
2016 7364 0.0 0.0 0.0
2017 2681 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-27 No Incident Encountered 0.00 0.00

For data sources see[7]

References