X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454283309000

Well Details

Well ID: 0454283309000
Loading map...
Location: 00/09-33-045-28W4/0
Location Alias: 00/09-33-45-28 W4M
Location Alias 2: 00/09-33-045-28 W4/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 28
Section: 33
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 9-33-45-28
Operator Name: Cenovus Energy Inc.
License Number: 0122892
License Date: 1986-03-07
License Status: Abandoned
Spud Date: 1986-03-24
Final Drill Date: 1986-04-10
Well Total Depth: 2273.00 m
Surface Hole Latitude: 52.925246
Surface Hole Longitude: -113.997197

For data sources see[1][2]

Well History

Date Event
1986-03-07 Obtained License
1986-03-25 Surface Casing Operation Performed
1986-04-08 Lost Circulation Occurred
1986-04-10 Finished Drilling
1986-04-10 Well Log Performed
1986-04-10 Well Mode changed to Drilled and Cased
1986-04-11 Lost Circulation Occurred
1986-04-13 Production Casing Operation Performed
1986-04-13 Rig Released
1986-07-26 Perforation Treatment Performed - Jet Perforation
1986-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-12 Well Began Production
1986-09-12 Well Fluid changed to Crude Oil
1986-09-12 Well Mode changed to Gas Lift
1989-05-20 Well Log Performed
1989-12-13 Well Log Performed
1991-03-21 Well Log Performed
1991-10-16 Well Log Performed
1993-12-21 Perforation Treatment Performed - Cement Squeeze
1993-12-29 Perforation Treatment Performed - Jet Perforation
1993-12-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-23 Well Log Performed
1995-12-20 Well Log Performed
1995-12-22 Perforation Treatment Performed - Cement Squeeze
1995-12-27 Perforation Treatment Performed - Jet Perforation
1995-12-27 Well Log Performed
1995-12-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-16 Well Log Performed
1996-09-17 Perforation Treatment Performed - Cement Squeeze
1996-09-17 Well Log Performed
1996-09-18 Perforation Treatment Performed - Jet Perforation
1996-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-06 Perforation Treatment Performed - Jet Perforation
1997-08-06 Well Log Performed
1997-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-21 Well Log Performed
1998-03-22 Perforation Treatment Performed - Jet Perforation
1998-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-23 Perforation Treatment Performed - Jet Perforation
1999-02-23 Well Log Performed
2000-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-11 Perforation Treatment Performed - Jet Perforation
2000-01-11 Well Log Performed
2000-12-13 Well Log Performed
2000-12-14 Well Log Performed
2000-12-15 Perforation Treatment Performed - Jet Perforation
2000-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-01-10 Well Log Performed
2001-05-29 Perforation Treatment Performed - Jet Perforation
2001-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-21 Well Log Performed
2001-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-22 Perforation Treatment Performed - Jet Perforation
2001-10-22 Well Log Performed
2010-11-16 Well Log Performed
2010-11-17 Well Log Performed
2010-11-24 Well Log Performed
2011-02-18 Well Log Performed
2011-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-22 Perforation Treatment Performed - Jet Perforation
2011-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-23 Perforation Treatment Performed - Jet Perforation
2011-07-14 Perforation Treatment Performed - Remedial Casing
2011-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-15 Perforation Treatment Performed - Jet Perforation
2011-07-15 Plug Back Performed
2011-07-15 Well Fluid changed to Crude Oil
2011-07-15 Well Log Performed
2011-07-15 Well Mode changed to Abandoned Zone
2011-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-16 Perforation Treatment Performed - Remedial Casing
2011-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-17 Perforation Treatment Performed - Jet Perforation
2011-07-17 Perforation Treatment Performed - Remedial Casing
2011-07-18 Perforation Treatment Performed - Jet Perforation
2011-07-18 Perforation Treatment Performed - Remedial Casing
2011-07-19 Perforation Treatment Performed - Jet Perforation
2011-07-19 Perforation Treatment Performed - Remedial Casing
2011-07-20 Perforation Treatment Performed - Jet Perforation
2011-07-20 Perforation Treatment Performed - Remedial Casing
2011-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-21 Perforation Treatment Performed - Jet Perforation
2011-07-21 Perforation Treatment Performed - Remedial Casing
2011-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-22 Perforation Treatment Performed - Jet Perforation
2011-07-22 Perforation Treatment Performed - Remedial Casing
2011-07-23 Perforation Treatment Performed - Remedial Casing
2011-07-25 Well Abandoned
2011-07-25 Well Fluid changed to Crude Oil
2011-07-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-07-26 Perforation 2250.70 2252.30 13
1996-09-17 Cement Squeeze 2252.00 2253.50 0
1996-09-18 Perforation 2247.50 2249.00 17
1996-09-19 Acid Treatment 2247.50 2249.00 0
1997-08-06 Perforation 2240.00 2242.00 17
1997-08-07 Acid Treatment 2240.00 2242.00 0
1998-03-22 Perforation 2230.00 2231.50 16
1998-03-23 Acid Treatment 2230.00 2231.50 0
1999-02-23 Perforation 2204.00 2207.00 17
1999-02-23 Perforation 2219.00 2222.00 17
1999-02-23 Acid Treatment 2204.00 2222.00 0
1986-07-27 Acid Treatment 2250.70 2252.30 0
2000-01-11 Perforation 2173.00 2174.50 17
2000-01-11 Perforation 2176.30 2177.80 17
2000-01-11 Perforation 2179.50 2181.00 17
2000-01-11 Perforation 2182.80 2184.30 17
2000-01-11 Perforation 2186.00 2187.50 17
2000-01-11 Perforation 2189.30 2190.80 17
2000-01-11 Perforation 2192.50 2194.00 17
2000-01-11 Acid Treatment 2173.00 2194.00 0
2000-12-15 Perforation 2149.00 2171.00 17
2000-12-18 Acid Treatment 2149.00 2171.00 0
1993-12-21 Cement Squeeze 2250.70 2252.30 0
2001-05-29 Perforation 2144.50 2146.00 17
2001-05-29 Perforation 2140.00 2141.50 17
2001-05-29 Perforation 2135.50 2137.00 17
2001-05-29 Perforation 2131.00 2132.50 17
2001-05-29 Perforation 2126.50 2128.00 17
2001-05-29 Perforation 2122.00 2123.50 17
2001-05-29 Perforation 2117.50 2119.00 17
2001-05-30 Acid Treatment 2117.50 2146.00 0
2001-06-13 Acid Treatment 2149.00 2194.00 0
2001-08-01 Acid Treatment 2117.50 2146.00 0
1993-12-29 Perforation 2254.50 2256.00 13
2001-10-22 Perforation 2099.00 2102.00 17
2001-10-22 Perforation 2095.00 2097.00 17
2001-10-22 Acid Treatment 2095.00 2102.00 0
2011-02-21 Packing Device Capped w/Cement 1768.00 1776.00 0
2011-02-22 Perforation 1764.00 1765.00 14
2011-02-23 Packing Device Capped w/Cement 1752.00 1760.00 0
2011-02-23 Perforation 675.00 676.00 14
2011-07-14 Remedial Casing Cementing 675.00 676.00 0
2011-07-15 Packing Device Capped w/Cement 658.50 666.50 0
2011-07-15 Perforation 604.50 605.50 17
1993-12-30 Acid Treatment 2254.50 2256.00 0
2011-07-16 Acid Treatment 604.50 605.50 0
2011-07-16 Remedial Casing Cementing 604.50 605.50 0
2011-07-17 Packing Device Capped w/Cement 587.00 595.00 0
2011-07-17 Perforation 574.00 575.00 17
2011-07-17 Remedial Casing Cementing 574.00 575.00 0
2011-07-18 Perforation 543.00 544.00 17
2011-07-18 Remedial Casing Cementing 543.00 544.00 0
2011-07-19 Perforation 513.00 514.00 17
2011-07-19 Remedial Casing Cementing 513.00 514.00 0
2011-07-19 Perforation 480.00 481.00 17
1995-12-22 Cement Squeeze 2254.50 2256.00 0
2011-07-19 Remedial Casing Cementing 480.00 481.00 0
2011-07-20 Perforation 447.00 448.00 17
2011-07-20 Remedial Casing Cementing 447.00 448.00 0
2011-07-20 Perforation 414.00 415.00 17
2011-07-20 Remedial Casing Cementing 414.00 415.00 0
2011-07-21 Perforation 380.00 381.00 17
2011-07-21 Remedial Casing Cementing 380.00 381.00 0
2011-07-21 Perforation 347.00 348.00 17
2011-07-21 Acid Treatment 347.00 348.00 0
2011-07-21 Remedial Casing Cementing 347.00 348.00 0
1995-12-27 Perforation 2252.00 2253.50 18
2011-07-22 Perforation 314.00 315.00 17
2011-07-22 Acid Treatment 314.00 315.00 0
2011-07-22 Remedial Casing Cementing 314.00 315.00 0
2011-07-22 Perforation 281.00 282.00 17
2011-07-22 Acid Treatment 281.00 282.00 0
2011-07-23 Remedial Casing Cementing 281.00 282.00 0
1995-12-28 Acid Treatment 2252.00 2253.50 0
1996-03-27 Acid Treatment 2252.00 2253.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1438 0.0 0.0 0.0
1987 6676 0.0 0.0 0.0
1988 7891 0.0 0.0 0.0
1989 7644 0.0 0.0 0.0
1990 7544 0.0 0.0 0.0
1991 7267 0.0 0.0 0.0
1992 4503 0.0 0.0 0.0
1993 6127 0.0 0.0 0.0
1994 7839 0.0 0.0 0.0
1995 6505 0.0 0.0 0.0
1996 5942 0.0 0.0 0.0
1997 8090 0.0 0.0 0.0
1998 8054 0.0 0.0 0.0
1999 8254 0.0 0.0 0.0
2000 8178 0.0 0.0 0.0
2001 6925 0.0 0.0 0.0
2002 8166 0.0 0.0 0.0
2003 8268 0.0 0.0 0.0
2004 8647 0.0 0.0 0.0
2005 7252 0.0 0.0 0.0
2006 8746 0.0 0.0 0.0
2007 8234 0.0 0.0 0.0
2008 8380 0.0 0.0 0.0
2009 2872 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-04-08 Lost Circulation 2095.00 2115.00
1986-04-11 Lost Circulation 2273.00 2273.00

For data sources see[6]

References