X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0454170612003

Well Details

Well ID: 0454170612003
Loading map...
Location: 00/12-06-045-17W4/3
Location Alias: 00/12-06-45-17 W4M
Location Alias 2: 00/12-06-045-17 W4/03
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 17
Section: 06
County/Municipality: Camrose County
Well Name: SCEPTRE ET AL HOLMBERG 12-6-45-17
Operator Name: Canadian Natural Resources Limited
License Number: 0092202
License Date: 1981-09-15
License Status: Issued
Spud Date: 1981-09-15
Final Drill Date: 1981-09-19
Well Total Depth: 1133.00 m
Surface Hole Latitude: 52.852401
Surface Hole Longitude: -112.466393

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-15 Obtained License
1981-09-19 Drill Stem Test Performed
1981-09-19 Finished Drilling
1981-09-19 Well Mode changed to Drilled and Cased
1981-09-20 Production Casing Operation Performed
1982-06-22 Perforation Treatment Performed - Jet Perforation
1994-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-31 Plug Back Performed
1994-08-31 Well Log Performed
1995-09-01 Perforation Treatment Performed - Jet Perforation
1999-03-17 Well Log Performed
1999-03-19 Perforation Treatment Performed - Jet Perforation
1999-03-19 Well Log Performed
1999-03-19 Well Mode changed to Drilled and Cased
1999-03-20 Well Began Production
1999-03-20 Well Fluid changed to Gas
1999-03-20 Well Mode changed to Flowing
1999-08-15 Perforation Treatment Performed - Fractured
2019-09-30 Well Fluid changed to Gas
2019-09-30 Well Mode changed to Suspended
2020-02-05 Well Fluid changed to Gas
2020-02-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-06-22 Perforation 1038.00 1039.00 7
1982-06-22 Perforation 1040.50 1041.50 7
1982-06-22 Perforation 1042.50 1043.50 7
1994-08-31 Packing Device Capped w/Cement 1022.00 1030.00 0
1995-09-01 Perforation 874.00 876.00 13
1999-03-19 Perforation 982.00 984.50 20
1999-03-19 Perforation 985.50 987.00 20
1999-08-15 Fracture 982.00 987.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 5690 0.0 0.0 0.0
2000 8493 0.0 0.0 0.0
2001 8533 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8655 0.0 0.0 0.0
2004 7980 0.0 0.0 0.0
2005 7787 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8756 0.0 0.0 0.0
2010 8299 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8715 0.0 0.0 0.0
2013 8570 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8595 0.0 0.0 0.0
2017 7943 0.0 0.0 0.0
2018 3312 0.0 0.0 0.0
2019 696 0.0 0.0 0.0
2020 984 0.0 0.0 0.0

For data sources see[5]

References